Laserfiche WebLink
<br />I <br />I NO. ITEM UNIT PRICE TOTAL PRICE <br /> UNIT AMOUNT <br />I C-8. Furnish and install PRV <br /> enclosure inc. concrete <br />I manhole (5') 4" PRV, (2) <br /> 4" valves, (2)'pressure <br /> gages, and all appurtances L.S. 3, 186. 00 1 3,186.00 <br />I C-9. The Forks Treatment Facility <br /> a. Pressure Fil ter L.S. Owner will furnish <br />I Installation loS. 863. 12 1 863.12 <br /> b. Chlorinators and Supply <br /> Tank L.S. 1,300.34 1 1,300.34 <br />I <br /> c. Ion Exchange Tanks <br /> (Twin Unit) L.S. Owner will furnish <br />I Installation L.S. 360.85 1 360.85 <br /> d. Pressure Tanks EA. 630.68 3 1,892.04 <br />I e. Booster Pump EA. 428.68 1 428.68 <br /> f. Flow Meters (2") EA. 246. 53 4 986.12 <br />I g. Piping, Valves & Misc. L.S. 1,481.19 I 1,481.19 <br />I h. Building L.S. Owner will furni sh <br /> f. Electrical L.S. 8,895.51 1 8,895.51 <br />I j. Site Grading L.S. 2,414.90 1 2,414.90 <br /> C-I0. The Tanks Treatment Facility <br />I a. Modifications to existing <br /> structure L.S. Owner will furnish <br />I b. Chlorinator and Supply <br /> Tank L.S. 1,214.55 1 1,214.55 <br />I c. Flow Meters EA. 249.65 2 499.30 <br /> d. Piping, Valves, & Misc. L.S. 1,004.45 1 7,004.45 <br />I e. Electrical L.S. 1,066.49 1 7,066.49 <br />I <br />I <br /> Document No. 3 <br />I <br />