My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00960
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:19 PM
Creation date
10/4/2006 9:39:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Title
Idledale Water System Improvements
Date
1/16/1990
Prepared For
Ideldale
Prepared By
Consultants
Floodplain - Doc Type
Community File
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />! I <br />I <br />I <br />I <br />:1 <br />II <br />'1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION II - SPECIFICATIONS <br /> <br />SPECIAL CONDITIONS <br /> <br />SC-l General Information, Location and Access <br />SC-2 Owner and Owner Representative <br />SC-J Consulting Engineer <br />SC-4 Resident Project Representatives <br />SC-5 Responsibility for Work <br />SC-6 Description of Work to be Done <br />SC-7 Surveying <br />SC-8 Protection of Property <br />SC-9 Materials, Standards and Specifications <br />SC-lO Testi ng <br />SC-ll Drawings <br />SC-12 Cl ean-Up <br />SC-IJ Final Inspection and Acceptance of Work <br />SC-14 Estimated Quantities <br />SC-15 Conflict 8etween General and Special Conditions <br /> <br />PIPE AND BEDDING MATERIALS <br /> <br />PM-I Pi pe <br />PM-2 Pipe Storage and Handling <br />PM-J Bedding Materials <br /> <br />PIPE INSTALLATION <br /> <br />PI-I Excavation and Preparation of Trench <br />PI-2 Materials to be Excavated <br />PI-J Pipe Placement <br />PI-4 Pipe Alignment and Grade <br />PI-5 Setting Valves and Hydrants <br />PI-6 Thrust Blocking <br />PI-7 Trench Backfill <br />PI-8 Filling and Venting Pipeline <br />PI-9 Disinfection and Flushing of Mains <br />PI-IO Pressure Test <br />PI-II Protection of Utility Lines and Structures <br />PI-12 Restoration and Clean-Up <br /> <br />SITE WORK <br /> <br />SW-I Site Work <br />SW-2 Earthwork, Grading, Excavation, Backfill <br />Embankment <br />SW-J Fencing <br /> <br />STRUCTURAL/ARCHITECTURAL <br /> <br />SA-I Concrete Work <br />SA-2 Concrete Block Masonry <br />SA-J Metal Doors, Windows and Frames <br />SA-4 Plastic Dome Skylights <br /> <br />PAGE <br /> <br />SC-I <br />SC-I <br />SC-I <br />SC-2 <br />SC-J <br />SC-J <br />SC-J <br />SC-J <br />SC-4 <br />SC-4 <br />SC-4 <br />SC-5 <br />SC-5 <br />. SC-5 <br />SC-5 <br /> <br />PM-I <br />PM-I <br />PM-l <br /> <br />PI-I <br />PI-I <br />PI-2 <br />PI-J <br />PI-J <br />PI-J <br />PI-4 <br />PI-6 <br />PI-6 <br />PI-6 <br />PI-7 <br />PI-7 <br /> <br />SA-I - 5 <br />SA-6 - 7 <br />SA-8 - 9 <br />SA-lO <br />
The URL can be used to link to this page
Your browser does not support the video tag.