<br />'. <br /> <br />TABLE 1 <br />SUMMARY OF WATER SYSTEMITREATHENT <br />IMPROVEMENTS/COSTS FOR COMMUNITY OF IDLEDALE <br /> <br />A. Phase I - Presently Under Construction <br />New wells <br />Treatment system additions and building modifications <br />New 6" water main - 2,400 feet <br /> <br />Total Cost: <br />($150,000 Impact Assistance Funds) <br />Additional $20,000 needed to complete the Project. <br />B. Phase II - <br /> <br />$170,000.00 <br /> <br />1. Items originally planned for in Phase I but, due to lack of funds, <br />eliminated from the first phase work: <br />( <br />(a) Storage tank modifications and rehabilitation <br />(painting inside of tanks and security fencing <br />for facility) $ 12,000.00 <br /> <br />~b) Fencing of new treatment facility at the Forks <br /> <br />(c) Additional 6" water line in Grapevine Road <br />excluded from current construction work <br />1,500 ft at $17.00/L.F. <br /> <br />Sub- Total 1. <br /> <br />$ 2,500.00 <br /> <br />$ 25,500.00 <br />$ 40,000.00 <br /> <br />I t. New dam and reservoir (10 acre-feet capacity) to be located at the <br />site of the old reservoir south of the storage tanks. <br /> <br />Construction: includes mobilization, site preparation, <br />embankment fill, outlet works, spillway, etc. <br /> <br />Construction <br />Contingency <br />Engineering <br />Legal <br /> <br />15~ <br />15~ <br />15~ <br /> <br />Total <br /> <br />$ 60,000.00 <br />9,000.00 <br />9,000.00 <br />9.000.00 <br />$ 87,000.00 <br />