My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00960
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:19 PM
Creation date
10/4/2006 9:39:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Title
Idledale Water System Improvements
Date
1/16/1990
Prepared For
Ideldale
Prepared By
Consultants
Floodplain - Doc Type
Community File
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
352
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ -- --.... <br />~.. - i <br /> <br />01>--"' <br /> <br />Rocky Mountain Consultants, Inc. <br /> <br /> <br />8301 East Prentice Avenue, SUite 101' Englewood, CO 80111'(303) 741.6000 <br />Offices also locateo In longmonl and Estes Pa rk. CO <br /> <br />April 28, 1989 <br /> <br />Mr. Jack Kirtland <br />Field Representative <br />DEPARTMENT OF LOCAL AFFAIRS <br />1313 Sherman Street, Room 520 <br />Denver, Colorado 80203 <br /> <br />RE: EIAF #1884 Idledale Water II <br />RMC Reference No. 0615.001.00 <br /> <br />Dear Mr. Kirtland: <br /> <br />In regard to your request, I want to respond in reference to .the process <br />following in selecting the second contractor to construct "The Forks" and "The <br />Tanks" treatment buildings. Initially, five contractors bid on the entire <br />job, in which Paramount Construction was the low bidder. The low bid was too <br />high for the available funds and subsequently modifications were made and the <br />project scaled down in order to have the funds to complete the project. <br />Negotiations were conducted with Paramount Construction for the scaled down <br />project. Upon review of the costs provided by Paramount, the Idledale Water <br />Board felt the cost of construction of the buildings was too high and wanted <br />additional bids by small local contractors. Subsequently, two more bids were <br />received from Burtle Construction and B.C.W. Jacobsen, Inc. for construction <br />of the buildings only. The following are the bids received for the buildings <br />construction: <br /> <br /> The The <br />Contractor Forks Tanks Bonds Total <br />Paramount $21,424.82 $14,564.76 $900.00 $36,889.58 <br />Burtle 8,970.00 9,500.00 * ]8,450.00 <br />Jacobsen ]6,029.00 (both buildings) 400.00 ]6,429.00 <br />*Burtl e cannot obtain Bonds <br /> <br />The Board decided to accept the Jacobsen bid for two reasons: (1) He can <br />obtain a bond, and (2) he had the lowest bid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.