My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00850
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00850
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:24 PM
Creation date
10/4/2006 9:32:06 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
31
County
Arapahoe
Community
Unincorporated Arapahoe County
Title
Major Drainageway Planning - Little Dry Creek, Report, Volume I
Date
2/1/1974
Designation Date
6/1/1974
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />prevent future reduction of hydraulic capacity. Channels must <br />be maintained. <br />6. Drops are used to limit flow velocity and thereby control ero- <br />sion where justified. <br /> <br />Grass-Lined Channels <br /> <br />1. The improved channel closely follows the existing natural channel <br /> <br /> <br />alignment and invert. <br /> <br /> <br />2. Flow velocity in a grass-lined channel does not exceed 7 feet per <br /> <br /> <br />second in straight stretches. Velocities at curves must be analyzed <br /> <br /> <br />separately. <br /> <br /> <br />3. Channel capacity must be adequate for 100-year flood with six <br /> <br /> <br />detention dams. <br /> <br /> <br />4. Channel side slopes are to be 4:l in new development. In already <br /> <br /> <br />built-up areas 3:1 side slopes may be permitted to reduce land <br /> <br /> <br />acquisition costs. In densely urbanized areas, the minimum slope <br /> <br /> <br />permitted would be 2~ to 1. <br /> <br /> <br />5. A uniform, dense stand of suitable grass is required. Blue grass <br /> <br /> <br />with adequate provision for sprinkling or other equally effective <br /> <br /> <br />grass is recommended. <br /> <br /> <br />6. At least 0.5 feet and preferably 1.0 feet of freeboard is recom- <br /> <br /> <br />mended for the lOO-year flood design discharge. <br /> <br /> <br />7. Drops are used to limit flow velocity if necessary. <br /> <br /> <br />8. Channel centerline curvature is at least twice the channel top <br /> <br /> <br />width, but not less than 100 feet. <br /> <br /> <br />9. Froude number of channel flow does not exceed 0.8 to prevent <br /> <br /> <br />excessive wave generation. <br /> <br /> <br />10. The channel section includes a well-defined low flow channel to <br /> <br /> <br />maintain non-silting low flow velocities. <br /> <br /> <br />11. Riprap or other slope protection is provided at transitions and <br /> <br /> <br />sharp bends to prevent erosion. <br /> <br />12. On-site detention of flood water must not be reduced by new develop- <br /> <br />ments. <br /> <br />Concrete-Lined Channels <br /> <br />l. The concrete-lined channel invert generally follows the existing <br />channel invert. <br /> <br />-51- <br />
The URL can be used to link to this page
Your browser does not support the video tag.