Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DES I G N <br /> <br />C R I T E R I A <br /> <br />The Little Dry Creek drainage design criteria are based on the two volume <br /> <br /> <br />Urban Storm Drainage Criteria Manual of the Denver Regional Council of <br /> <br /> <br />Governments, 1969. Selection of specific technical solutions to drainage <br /> <br /> <br />problems and evaluation of benefits to be derived from drainage improve- <br /> <br /> <br />ments required continuing consultation with officials of government enti- <br /> <br /> <br />ties who have responsibilities and interests in the area. <br /> <br />During the first phase, Phase A, of the Little Dry Creek drainage study <br /> <br /> <br />meetings were held with planning, engineering, maintenance, and adminis- <br /> <br /> <br />trative representatives of Arapahoe County, the City of Englewood, the <br /> <br /> <br />City of Cherry Hills Village, the City of Greenwood Village and Douglas <br /> <br /> <br />County to discuss planning concepts and to select specific design features. <br /> <br /> <br />The Urban Drainage and Flood Control Disttict personnel were regularly con- <br /> <br /> <br />sulted and advised of progress. <br /> <br />State and Federal agencies were also contacted to develop design criteria. <br /> <br /> <br />These included the following: <br /> <br /> <br />1. Colorado State Engineer's Office <br /> <br /> <br />2. U.S. Army, Corps of Engineers <br /> <br /> <br />3. U.S. Department of Agriculture, Soil Consetvation Service <br /> <br /> <br />4. U.S. Department of the Interior, Geological Survey and Bureau <br /> <br /> <br />of Reclamation <br /> <br />Meetings with personnel of the foregoing organizations were also held <br /> <br /> <br />during the second phase of the study, Phase B, to review progress in the <br /> <br /> <br />development of the preliminary Little Dry Creek drainage plan. Also during <br /> <br /> <br />the study preliminary drainage plan information was supplied to a number of <br /> <br /> <br />city officials, other consulting engineers, and individuals who were inter- <br /> <br /> <br />ested in the area. <br /> <br />-48- <br />