My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00844
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:51:19 AM
Creation date
10/4/2006 9:31:54 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Title
Supplemental Specifications to the 1986 Standard Specifications for Road and Bridge Construction
Date
9/1/1989
Prepared For
State of Colorado
Prepared By
State of Colorado Department of Highways
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Payment for stockpiled materials will not relieve <br />the Contractor of responsibility for loss or damage to <br />the material. Payment for living or plant materials, <br />perishable materials, or materials which will not <br />. become an integral part of the finished project will <br />not be made under this subsection. <br /> <br />109.08 Adjustments for Changes in Com- <br />mon Carrier Rates. It is understood and agreed <br />that the accepted proposal for the contract work is <br />based on common carrier rates in effect on the date of <br />bid opening. Payments to the Contractor will be ad- <br />justed to compensate for increases and decreases in <br />cost due to changes in common carrier rates be- <br />coming effective after the date of bid opening and <br />before the date stipulated for the completion of the <br />work, as adjusted because of authorized extensions <br />of time. The adjustment shall be a product of the <br />increase or decrease in the said common carrier rates <br />multiplied by the net quantity of material shipped at <br />the new rates to the work and incorporated therein, <br />all as shown by receipted common carrier bills. <br /> <br />109.09 Acceptance and Final Payment. <br />When the project has been accepted as provided in <br />subsection 105.16, the Engineer will prepare the final <br />estimate of the quantities of the various classes of <br />work performed. After approval of the final estimate <br />by the Contractor, payment of the entire sum found <br />to be due after deducting all previous payments and <br />all amounts to be retained or deducted under the <br />provisions of the Contract will be made. <br />All prior partial estimates and payments shall be <br />subject to correction in the final estimate and pay- <br />ment. <br /> <br />37 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.