Laserfiche WebLink
<br /> <br />TABLE OF PRICE REDUCTION <br />FACTORS <br /> <br />Element <br /> <br />Factor "F" <br /> <br />. 100 percent size sieve <br />'h inch sieve and larger <br />No. 100 sieve to % inch sieve <br />inclusive (except 100 percent size <br />sieve) <br />No. 200 sieve <br />Compaction, bituminous mixtures <br />(Sections 301 and 403) <br />Liquid Limit <br />Plasticity Index <br />Asphalt content, (all asphalt <br />aggregate mixtures) <br />Asphalt penetration <br />AC 2.5, viscosity, 1400 F., poises <br />AC 2.5, viscosity, 2750 F., <br />centistokes <br />AC 5, viscosity, 1400 F., poises <br />AC 5, viscosity, 2750 F., centistokes <br />AC 10, viscosity, 1400 F., poises <br />AC 10, viscosity, 2750 F., <br />centistokes <br />AC 20, viscosity, 1400 F., poises <br />AC 20, viscosity, 2750 F., <br />centistokes <br />AC 40, viscosity, 1400 F., poises <br />AC 40, viscosity, 2750 F., <br />centistokes <br />Liquid asphalt, viscosity, 1400 F., <br />centistokes, Grade 30 <br />Liquid asphalt, viscosity, 1400 F., <br />centistokes, Grade 70 <br />Liquid asphalt, viscosity, 1400 F., <br />centistokes, Grade 250 <br />Liquid asphalt, viscosity, 1400 F., <br />centistokes, Grade 800 <br />Liquid asphalt, viscosity, 1400 F., <br />,centistokes, Grade 3000 <br />Asphalt residue <br />Portland Cement Concrete Pavement <br />Density <br /> <br />0.02 <br />3 <br /> <br />20 <br />1 <br />0.4 <br /> <br />1.2 <br />0.20 <br />0.80 <br />0.10 <br /> <br />0.60 <br />0.05 <br /> <br />0.40 <br />0.025 <br /> <br />0.30 <br /> <br />0.7 <br /> <br /> <br />0.25 <br /> <br />0.08 <br /> <br />If P is less than 3, or a negative quantity, the <br />material will be accepted as being in conformity. In <br />cases where one or more elements show a positve P <br />value, such positive values will be added and the <br />resulting sum will be used to determine whether the <br />material is in conformity. If the total P value is <br />between 3 and 25, the Engineer may require <br />correction or he may accept the material at a reduced <br />price. If P is greater than 25, the Engineer may: (1) <br />require complete removal and replacement with specifi- <br />cation material at no additional cost to the Division; <br />(2) require corrective action to bring the material into <br />conformity at no additional cost to the Division; or <br />(3) where the finished product is found to be capable <br />of performing the intended purpose and the value of <br /> <br />1 <br />1 <br /> <br />the finished product is not affected, permit the <br />Contractor to leave the material in place with an <br />appropriate price adjustment to be based on engineer- <br />ing evaluation but not to be less than that which <br />would have occurred had an adjustment been made <br />where P = 25. <br />When aggregate sieve analysis for Item 304 <br />deviates from specification requirements and the <br />total Pis 3 or greater, the reduction will apply to the <br />Contract price multiplied by 0.60. <br />If asphalt cement is not paid for separately, the <br />following will apply: <br />(1) When the penetration value or viscosity of <br />asphalt deviates from specification require- <br />ments and Pis 3 or greater, the reduction will <br />apply to the Contract price multiplied by 0.30 for <br />Items 301 and 403 and 0.20 for Item 410. <br />(2) When the aggregate sieve analysis, asphalt <br />content or compaction deviates from the specifi- <br />cation requiremente and the total P is 3 or <br />greater, the reduction will apply to the Contract <br />price multiplied by 0.60 for Items 301 and 403, <br />and 0.70 for Item 410. <br />Acceptance and pay factors for air content and <br />slump of all concrete will conform to 601.17. <br />When analyzing Item 412, Concrete Pavement, <br />and Item 601, Structural Concrete, for determination <br />of price adjustment, the following method will be <br />used: <br />When the aggregate sieve analysis or con- <br />crete pavement density deviates from speci- <br />fication requirements and the total P for the <br />item is 3 or greater, the reduction will apply <br />to the contract price multiplied by 0.60 for <br />Item 412 and 0.05 for Item 601. <br />When the aggregate sieve analysis for <br />concrete aggregate deviates from speci. <br />fication requirements and the total P for the <br />item is 3 or greater, the reduction will apply <br />to the contract price multiplied by 0.20 for <br />Items 507, Slope & Ditch Paving, 606, Guard- <br />rail, 608, Sidewalks and 609, Curbing. <br />Price adjustment for those elements which are not <br />included in the Table of Price Reduction Factors will <br />be determined by the Engineer. <br />The Contractor will not have the option of <br />accepting a price reduction in lieu of producing <br />specification material. Continued production of non. <br />specification material will not be permitted. Material <br />which is obviously defective may be isolated and <br />rejected without regard to sampling sequence or <br />location within a lot. <br /> <br />3 <br />6 <br /> <br />7 <br />3 <br />10 <br /> <br />1 <br /> <br />8 <br /> <br />105.04 Coordination of Plans, Specifica- <br />tions, Supplemental Specifications, and Spe- <br />cial Provisions. These specifications, the supple- <br />mental specifications, the plans, special provisions, <br />and all supplementary documents are essential parts <br />of the Contract, and a requirement occurring in one <br />is as binding as though occurring in all. They are <br /> <br />13 <br />