<br /> TABL~ V-1 Sheet J of 2
<br /> FLOOD OAM~6E 8Y CATEGORY
<br /> MAIL CREEK ANOMcCLELLANDS BASINS
<br /> Average Annual
<br /> Reach Category 2-Year 10-Year 25-Year 50-Year 100-Year Damage Cost
<br /> -.
<br /> IA latal ReachlA 0 0 0 0 0 0
<br /> 18 SFR w/b~ 0 0 0 0 27.500
<br /> Road and Culve,-ts 0 0 0 193,050 193,050
<br /> Clean-Up 0 0 0 32,790 32.790
<br /> Total ReachlB 0 0 0 225,840 253,340 7,630
<br /> Ie Roads and Culv~rts 0 0 31,200 31,200 31,200
<br /> Clean-Up 0 0 14.380 14.380 14.380
<br /> Total Reach 11 0 0 45,580 45,580 45,580 3,210
<br /> 10 lotalReaCh 10 0 0 0 0 0 0
<br /> 2A SFR w/o b~ 5,840 11,660 13,820 15,250 15,960
<br /> Industrial 16,150 76,370 162,010 232,760 337,710
<br />< Roads and Culverts 5,560 11,130 22,260 22,260 22,260
<br />, Clean-Up 4,520 5.160 8,780 10,820 13,650
<br />"
<br /> Total Reach2A 32,070 104,320 206,870 281,090 389,310 58,930
<br /> 18 Oitches 0 1,300 1,300 2,630 3,950
<br /> Roads and Culverts 1,160 3,690 6,470 8,890 11,560
<br /> Clean-Up 6,410 7,210 8,440 9,500 12,510
<br /> Total Reach 1B 7,570 12,200 16,210 21,020 28,020 8,270
<br /> ] Oitches 0 0 14,690 23,620 31,720
<br /> Clean-lip 0 0 6,370 6,370 6,370
<br /> Total Reach ] 0 0 21,060 29,990 38,090 2,030
<br /> '^ SfR wi b~ 0 0 39,210 46,640 48,300
<br /> SFRw/ob* 0 0 2,950 3,510 3,640
<br /> Clean-Up 0 0 4,860 5.790 7,790
<br /> Total Reach '^ 0 0 47,020 55,940 59,730 3,810
<br /> 4B CO.l1lercial 0 3,350 4,310 4,780 9,090
<br /> C1Nn-Up 3,350 5,310 6,400 7,380 8,890
<br /> Total Reach 4B 3,350 8,660 10,710 12,160 17,980 4,500
<br />
<br /> TABLEV-l She€t2of2
<br /> FLOOD DAMAGE BY CATEGORY
<br /> MAll CREEK AND McClEllANDS BASINS
<br /> --
<br /> AveraqeA'lIlual
<br /> Reac~ Category 2-Year 10-Year 25-Year 50-Year lOD-Year Damage Cost
<br /> 5 Ditches 1,300 1,300 1,300 2,650 3,950
<br /> Roads and Culverts 1,160 3,690 6,470 8,890 11,560
<br /> Clean-Up 4,520 6,010 7,060 8,720 10,300
<br /> Total Reach 5 6,980 11,000 14,830 20,260 25,810 7.020
<br /> 6A Roads and Culverts 1,460 2,630 5,250 8.750 8,750
<br /> Clean-Up 5,730 10.020 11,100 12,530 14.600
<br /> Total Reach 6A 7,190 12,650 16,350 21,280 23.350 7.920
<br /> 6B Railroads 0 27,060 27,060 27,060 27,060
<br /> Clean-Up 5,730 39)650 40,620 41,860 44,460
<br /> Total Reach 6B 5,730 66710 67,680 68,920 71,520 27,510
<br />. 6C Total Reach 6C 0 0 0 0 0 0
<br />,
<br />~,
<br /> 60 Clean-Up EllO 1.720 2,190 2,450 2.920
<br /> Total Reach 60 880 1.720 2,190 2,450 2,920 970
<br /> ~_._-- ----~
<br /> *SfR . Single family Re~ identlal; w/b = with basement; ~/o b a without basement.
<br />
|