My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00812
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:27 PM
Creation date
10/4/2006 9:29:57 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Fort Collins
Stream Name
McClellands and Mail Creek
Title
Major Drainageway Planning
Date
12/1/1980
Prepared For
Fort Collins
Prepared By
CWCB
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTlONIV <br /> <br />Flood Hazard Areas <br /> <br />Hydraulic Determinations <br /> <br />The Mail Creek and McClellands Basins are presently in different stages of <br />useanddevelopmentvaryingfrOOlexistingagriculturaltofullydevelopedcondi- <br />tions. With the exception of Larimer County Voc-Tech Center and portions of the <br />basins adjacent to College Avenue, the developed reaches are in residential use. <br />Those portions of tne basins which are most subject to the hazards of flooding are; <br />ReachNo.l (Plates2,3and4) <br /> <br />Analyses of the hydraulic characteristics of Mail Creek and McClellands <br />Basins were performed to provide estimates of the water surface elevations to each <br />of the design floods for the existing channel conditions. A total of approximately <br />5.9 miles of channel was included in the analysis, with 3.6 miles in Mail Creek and <br />2.3 miles in McClel1ands Basin. All floodplains were delineated by routing the peak <br />flood flow through the channel and calculating the depth of flow in the channel and <br />adjacent floodplain. ThedepthofafloOd,orwatersurfaceelevation, is directly <br />related to the conveyance characteristics of the channel and floodplains: channel <br />geometry, roughness, longitudinal slope, and presence of obstructions such as bridges, <br />houses and large trees. <br />Water surface profiles and floodplains were computed using the most recent <br />version of the U.S. Army Corps of Engineers HEC-2 computer program (Reference i3). <br />Cross.sections were digitized from available topographic maps and have been augmented <br />by field surveys at regularly spaced intervals and at Channel obstructions (culverts, <br />roads, etc.). Locations of the cross-sections are depicted on the existing fl ood- <br />plain plates with a more detailed description contained within the Technical Addendum. <br />Cross-sections that were field surveyed are noted with an asterick (*) on the flooded <br />area plates. <br />Channel roughness coefficients (Manning's "n"values) for these computations <br />were assigned on the basis of fie~ inspection of the floodplain areas (tabulated in <br />the Technical Addendum). Hydraulic losses through culverts have been determined with <br />the use of nomographs publiSh€d by the Bureau of Reclamation and input into HEC.2 <br />program. In developing rating curves for the culverts in the study reache s,zero <br />blockage was assumed for culverts greater than 2-feet in diameter. The normal bridge <br />routing of the HEC-2 program was used to calculate losses through non-standard cul- <br />verts. The structural integrity of existing culverts, bridges, detention dams and <br />other Channel features has not been eV1l1uated in this analysis, except FainolayDam. <br />Fairway Dam has been re.evaluated by the State Engineer's office. The ori. <br />ginal design of Fairway Dam was based on a significantly smaller drainage area and a <br />lower intensity of development whiCh indicated the dam, spillway and culverts under <br />Palmer Drive were sufficient to handle the flood flows. However, present re-evalua. <br />tion indicates a need for further study and probably structural improvements to acco- <br />modate larger flood flows whiCh have resulted from new development in the contributing <br />drainage area. The enlarged basin is the result of the diversion of flows in the <br />upper portion of the historic McClellands Basin at the C & S Railroad into and <br />through the New Mercer DitCh to Mail Creek. <br />Computed water surface profiles and the floodplain delineation for the 100- <br />year existing and future discharges are shown on the existing floodplain plates for <br />designated reaches at 1" = 200' scale. These plates a~ at the end of this section. <br />Floodplains for the 2-, 10-, 25~, and 50.year events have been plotted on working <br />drawings and are included in the Techn1cal Addendum. Water surface elevations for <br />these storms have also been tabulated on Tables IV-l and IV-2. <br /> <br />Mail Creek drainageway within Fairway Estates Subdivision, although deep <br />and subject to some erosion, does not pose a significant floodlng ha~ard. For the <br />most part, the runoff from the lDO-year storm is contained within the existing <br />channel and sufficient right-of-way for flood flows was provided at the time of <br />deve~opment. There are two (2) exceptions to the containment of the 100-year run- <br />off ln this reach. One lS at the Passway Drive crossing of Mail Creek. The insuf- <br />ficient culvert capacity under Passway Drive causes a backwater condition which <br />results in water overtopping the road and some flooding of adjacent residential <br />properties. The other exception is at Palmer Drive, where the box culverts whiCh <br />are part of the Fairway Dam spillway do not have enough capacity for more than the <br />25-yearstorm. <br /> <br />Reach No.2 (Plates 4, 5 and 6) <br /> <br />Both the access road to Nordic Construction Company and Crest Road in the <br />lOwer end of Reach No.2 are overtopped during even small storms causing ero,ion <br />and the potential for loss of access. In addition, the existing house in between <br />these.tworoadsisthreatenedbythel00-yearflood. Eventhoughthel00-year <br />flow lS below the first flood elevation, backwater behind the Nordic Construction <br />Company access road and the C & S Railroad may cause structural damages to the <br />building. <br /> <br />Prior to the construction of the improvelnellts for Theioioodl<lnd ,PUD<lnd<ll <br />the time of initiation of this study, Harmony Road from about 500.feet west of <br />Crest Road to Shields Street was SUbject to inundation during the lOO.year runoff. <br />Three of Larimer County Voc-Tech Center's buildings and their contents have asso- <br />ciated damages from this major storm as well. The drainage swale parallel to <br />Harmony Road which has been constructed by Woodlands PUD was designed to contain <br />the lOO-year flows, but the structures for crossings over this swale and the <br />crossing at Karmony Road were designed for the 2-year historic runoff. <br />All four (4) legs of the intersection of Shields Street and Kanmony Road <br />are overtopped dUrlng even theminorstormcaosingthepotentia, fo rserious in- <br />terruption to traffic in this part of Fort Collins. Upstream of Shields Street, <br />there is a wide floodplain resulting from the damming effect of this intersection. <br />A little further west, the Pleasant Valley and lake Canal is overtopped causing <br />damage to ditch banks and the potential introduction of silt and excess water into <br />the irrigation syste~. <br /> <br />IV-l <br /> <br />IV-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.