Laserfiche WebLink
<br />"- <br /> <br />- <br /> <br />FEMAUSEONlY <br /> <br />~t~ERAL EMERGENCY MANAGEMENT AGENCY 0 M 8. Burden No 3067.0148 <br />RIVERINE HYDRAULIC ANAL Y515 FORM Exp"., July 31 1994 <br />. - <br />PUBLIC BUI{IH:N DISCLOSURE NOTICE <br /> <br />i <br />, <br />Pub! ic reporting burden for this form is eSlimaLed to average 2.25 hours per response'. The burden estimate includes Lhe I <br />time for reviewing instructions, searching existing data sources, gathering and maintaining t.he needed data, and <br />completing- and reviewing the form. Send comments regarding the accuracy of the burden estimate and any suggestions <br />for reducing this burden, to: Information Collections Management, Pederal Emergency Management ^gency, 500 C <br />Street, S. W., Washington, DC 20472; and to the Office ofManagemenl and Budget. Paperwork Reduction Project (3067. <br />0148), Washim(ton, DC 20503. <br /> <br />Community:'\lame: City of Greeley <br /> <br />Flooding Source: Cache La Poudre River <br />(Vue (urm (ur each fluodmg :wurce) <br /> <br />Project Name/ldenlifier: <br /> <br />"- <br /> <br />City of Greeley Floodplain and .FloodwAY 'lllelyd', <br />1. REACH TO BE REVISED <br /> <br />Down~tream limil: <br />Upstream limit; <br /> <br />Station 24540 Below Ash Avenue Brid.ge <br /> <br /> <br />Station 30700 Downstream 5th Avenue_B.ridgp <br /> <br /> <br />2. EFFECTIVE FIS <br /> <br />3. HYDRAULIC ANAL YSI5 <br />Why is the hydraulic analysis different from thaL used to develop the I"!HM. (Cheek ail Ihal apply) <br />o Not studied in FIS <br />o Improved hydrologic data/analysis. Explain: <br /> <br />o Not studied <br />o Studied by approximate methods <br />Downstream limit of study <br />Upstream limit of study <br /> <br />o Studied by detailed methods <br />Downstream limit of study <br />Upstream limitofstudy <br />o Floodway delineated <br />Downstream limit of Flood way <br />Upstream limitofFloodway <br /> <br /> <br />{[l Improved hydraulic analysis. Explain: Addition of nl.lIIle.J:.j n,,~ cross see tions between <br />Ash Avenue and US Highway 85 <br /> <br />o ~'Iood control structure. [':xplain: <br /> <br />!ZI Other. I';xplain: Construction of new highl<ay bridges over the Cache La Poudre River <br />at Ash Avenue and 8th Street <br /> <br />Page' of 6 <br /> <br />Riverine Hydrcluli< Analysts I-arm <br /> <br />FEMA form 81.89(, AUG 93 <br /> <br />Farm4 <br />