Laserfiche WebLink
<br />"""'''' <br /> <br />I <br />I <br />, <br />I <br />I <br />I <br />, <br />, <br />, <br /> <br />-,'" <br /> <br />Land Treatment Measures <br /> <br />All project costs aTe allocated to flood prevention, The installation <br />cost of the structural measures amortized at 5-1/8 percent over 100 <br />years is $1181960, including annual operation and maintenance costs <br />estimated at ~3,860. The ratio of benefits, $252,330, to costs, <br />$118,960, is 2.1 to 1.0. <br /> <br />Land treatment measures will be established by the land owners and oper- <br />ators of private and State land in cooperation with Soil Conservation <br />Districts. Measures to be applied include practices for watershed pro- <br />tection, land and vegetative ilnprovement. irrigation water JI\81l3gement <br />and wildlife enhancement. These measures will be applied during the <br />five~year project installation period. <br /> <br />Costs for land treatment measures are estimated to be $1,408,730. Of <br />this <lJIW;)Ultt, $1,325,230 will be provided by other than Public Law 566 <br />funds. P\bUc Law 566 funds estimated to be $80,000 will be used for <br />technical assistance to accelerate the planning and application of land <br />treatlllent measures on private and State land. About $3,500 will be pro- <br />vided to the U. S. Forest Service of which $2,400 will be used for e(l.uip- <br />roent for fire control intensification and $1,100 for technical assistance. <br />Costs of land treatment measures already applied on watershed lands are <br />estimated at $1,205,350. <br /> <br />Structural Measures <br /> <br />I <br />, <br />,. <br /> <br />The stroctural measures included in the plan consist of five single pur- <br />pose floodwater retarding structures and one grade stabilization struc- <br />ture. The structures will have combined capacities of 13,657 acre~feet <br />for floodwater detention and ICO-year sedil1lent retention. The structures <br />will provide flood protection to 7,182 acres of flood plain land. The <br />estimated installation cost of these structures is $2,231,000. Public <br />Law 566 share is estimated to be $2,168,000. Other foods share is esti. <br />mated to be $63,000. <br /> <br />OPEAATl()ll AND MAlNI'ENANCE <br /> <br />Land treatment measures will be maintained by the land owners and oper- <br />ators of the private and leased State land on which the lIleasures are <br />installed. The Colorado Division of Game, Fish and Parks will maintain <br />the measures installed on the Wellington State Wildlife Area at an esti- <br />mated annual cost of $5,000. Operation and maintenance of the five <br />floodwater retarding structures and one grade stabilization structure <br />will be the responsibility of the North Poudre Irrigation Cmtpany. <br />Estimated amual costs for operation and maintenance of structural <br />measures are estimated at $3,860. <br /> <br />BENEFITS A..'ffi COSTS <br /> <br />The average annual benefits accruing to the project are estimated at <br />$264,280. About $11,950 accrue annually to land treatment measures and <br />$252,330 to structural measures. Estimated flood dllJll3ge reduction bene- <br />fits are $159,360, more intensive land use benefits are $11,240 and <br />secondary benefits of a local nature are $21,730. <br /> <br />-III- <br /> <br />.IV. <br />