Laserfiche WebLink
<br />Works of Improvement <br />StructureB-4 <br /> <br />Works of Improvement <br />Structure B-4 and B-S <br /> <br />The emergency spillway will be excavated into silty clay lying over silty <br />clay shale which will require sane protection frorn erosion. Adequate . <br />amounts of satisfactory borrow materials are available from the reservoH <br />area close to the dam. <br /> <br />About 12.0 acres of dry cropland is in the floodwater pool with the <br />remainder being rangeland. <br />Floodwater Retaroinr, Structure B-S <br />Floodwater retarding structure B-5 is located on upper Boxelder Creek <br />about 2-1/2 miles above juncture with Sand Creek. <br />Site Geology <br />Bedrock underlying the B-5 dam site consists of red shales. siltstones, <br />rmd sandstones of the Lykins Fonnation of Permian Age. The rock layers <br />dip about 15 degrees to the east and crop out only in the upper part of <br />the right abutment. An alluvial fan consisting of sandy silt and clay <br />with a few thin layers of cobbles and boulders forms the left abutment <br />of the dam site. The valley bottan at the site contains alluvial <br />deposits cOll5isting mainly of sandy and clayey silt. The alluviun <br />material appears to bave a fairly 101<1 shear strength and a high consoli- <br />dation potential. The maximLan thickness of the alluvllvn in the left <br />abutment and in the valley bottom is probably about 40 feet. The emer- <br />gency spillway will be excavated into red silty shales and shaly silt- <br />stones which should be moderately resistant to erosion. Adequate alnOWlts <br />of borrow materials are available from the emergency spillway excavation <br />and fran the reservoir area close to the dam. <br />Classification, Drainage Area and Storage <br />The StructUI~ has (a) classification. The drainage area above the struc- <br />ture is 19.6 square-miles. The structure has 100-year sediment storage <br />of 198 acre- feet. Floodwater capaci ty is the average of the 2S-year <br />and the SO-year frequency storm runoff which is 941 acre-feet. Total <br />capadtyisl,139a.cre-feet. <br />Embankment <br /> <br />Classification, Drainage Area and Storage <br />Structure B-4 has (a) classification. The drainage area above the <br />structure is 13.5 square-miles. The structure has 100-year sediment <br />capacity of 188 acre-fect. Floodwater capacity is the average of the <br />ZS-year and 50-year frequency stom nmoff tohich is 720 acre-feet. <br />Total capacity is 908 acre-feet. <br /> <br />Embankment <br /> <br />The embankment will consist of about 114,000 cubic-yards of compacted <br />earthfill. The maximun height of the embankl1ient is about 27 feet and <br />the top length is about 2,170 feet. The embankment will be a hCllloge- <br />neous fill having an upstream slope of 3:1 and a downstream slope of <br />2.5:1. A gravel filter blanket will be installed unde~ the d~TIstream <br />toe of the dam to provide embankment drainage. <br /> <br />Foundation Treatment <br />A core to bedrock will be constructed to provide a positive cutoff. <br />This is estimated to ~equire about 32,000 cubic-yards of excavation and <br />compacted earthfill. <br /> <br />Principal Spillway <br />'fhe principal spillway will be a 30-inch diameter reinforced concrete <br />pipe about 135 feet long. The inlet structure will be a single stage <br />standa~d two-way covered riser about 12 feet high. The riser crest will <br />be at the 50-year sediment pool level. Release time for the retarded <br />voluoe is about 5 days. The SO-year sediment pool will be drained by <br />a 24-inch diameter ungated drawdown pipe. The principal spillway will <br />have an impact basin outlet structure, <br /> <br />The embanlonent will consist of about 318,000 cubic-yards of compacted <br />earthfill including about 22,000 cubic-yards of gravel filter material. <br />The 1IIaXi.rrun height of the emankment is about 67 feet and the top length <br />is about 1,240 feet. The embankment will be a homogeneous fill except <br />for a chimney drain system. Elltankment will have a 3.5:1 upstream slope <br />and a 3:1 downstream slope. <br /> <br />F~rgency Spillway <br />The emergency spillway will be vegetated earth. It will be constructed <br />around the east end of the dam. The ~pillway depth will be 6.0 feet, the <br />hettan width will be Z20 feet and the level section is about 400 feet. <br />The frequency of emerllency spillway flow is once in 37 years. <br /> <br />1"0unJation Treatment <br /> <br />1he site requires <br />flood pool area. <br />the dam, the dam, <br /> <br />about 137 acres for the dam, emergency spillway and <br />Except for ahoot 0.1 acres of dry cropland needed for <br />emergency spillway and sediment pool are rangeland. <br /> <br />Foundation treatment for the B-S structure will consist of rem:wing and <br />recompacting the foundation material beginning at the ground surface and <br />the embankment toes and extending downward on a 2:1 slope to the water <br />table. Below the water table a core with 2:1 slopes and 12 foot bottan <br />width will be constructed to bedrock. This is estimated to require <br />moVing about 138,000 cubic-yards above the water table and 37,000 cubic <br />yards below the water table. <br /> <br />Land Rights and Land Use <br /> <br />-27- <br /> <br />-28- <br />