My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00789
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:46 AM
Creation date
10/4/2006 9:28:34 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Weld
Community
Larimer County, Weld County
Stream Name
Boxelder Creek
Title
Watershed Work Plan
Date
2/1/1971
Prepared For
Larimer County
Prepared By
USDA Soil Conservation Service
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Works of Improvement <br />Structure 8-2 <br /> <br />, <br />I <br />I <br />, <br />, <br /> <br />Works of Iaq>rovement <br />Structure B-2 and B-3 <br /> <br />Floodwater Retardi~ Structure B-2 <br />Floodwater retarding structure B-2 is located on Boxelder Creek just <br />below juncture with Rawhide Creek. Most of the site is on rangeland. <br />Site Geology <br />Bedrock underlying the B-2 dam site consists of silty clay shale of the <br />upper part of the Pierre Formation of Upper Cretaceous age. The shale <br />is firm with little or no fracturing and is relatively impermeable. It <br />is at or near the surface in both abutments of the daJn and in the emer- <br />gency spillway area. The valley bottan at the site contains alluvial <br />deposits consisting mainly of a few feet of sandy silt and clay over- <br />lying permeable sands and gravels. Wells downstream fran the darn indi- <br />cate that the maxiJrurn thickness en the alluvium is about SO feet. The <br />emergency spillway will be excavated into silty and sandy shale. Ade- <br />quate amounts of satisfactory borrow materials are available fran the <br />emergency spillway excavation and fran the reservoir area. <br />Classification, Drainage Area and Storage <br />This structure has (b) classification. The total drainage area above <br />the structure is 111.1 square-miles of which 34.6 square-miles is con- <br />trolled by B-5 and 8-6. The remaining area controlled by B-2 is 76.5 <br />square-miles. <br />The structure has a lOa-year sedilllent storage of 1,162 acre-feet and <br />the SO-year frequency storm runoff storage of 5,304 acre-feet for a <br />total storage of 6,466 acre-feet. <br />cnbankment <br />The embankment will consist of about 865,000 cubic-yarOs of rolled <br />earthfill with a maxinrull height of about 46 feet and a top length of <br />about 5,92D feet. The embankment will be a zoned fill section having <br />a center core and upstream and downstream zones CQIlSisting of the coarse <br />permeable material available at the site. The downstream zone will ex- <br />tend down through the natural blanket of 4 to 6 feet of fine material <br />and connect to gravels underlying the site to provide embanl:ment drain- <br />age. Embankment slopes will be 3:1 upstre3lD and 2:1 dolmstreron. <br />Foundation Treatment <br />A alt-off core will be made for a short distance in each abutment where <br />shale is near the surface. About 35,OOD albic-yards of the natural <br />blanket of fine material under the downstream zone of the embankment <br />will be I"elllOved and replaced with permeable IlIaterial. Suppl~ntal <br />blanketing will be done in the present channel and old channel areas to <br />obtain a continuous blanket a mininwm of 3 feet thick extending at least <br />500 feet upstream fran the upstream toe of the daro. This is estimated <br />to take &boot 9O,ODO cubic-yards of earth fill. <br /> <br />Principal Spillway <br />The principal spillway conduit will be a 48.inch diameter reinforced <br />concrete pipe. The inlet structure will be a single stage standard <br />two-way covered riser 20 feet high. The riser crest will be at the <br />SO-year sediment pool level. The release time for the retarded vollX1le <br />is 10 days. The 50-year sediment pool will be drained by a 30-inch <br />diameter Utlgated drawdown pipe. The principal spillway will have an <br />impact basin outlet structure. <br /> <br />Canal Crossing <br />ln addition to the principal spillway, a 48-inch diameter gate" conduit <br />110 feet long will be constructed through the dam to pass the North <br />Peudre Irrigation Company diversion canal flows. Canal bottom elevation <br />at the dam centerline station 67 + 10 is 5514.7 feet. It will have a <br />slide gate ....ith control WQrks on top of the dam. It will have an im- <br />pact basin outlet strncture. The irrigation canal and diversion are <br />above the HlD-year sediment pool and will not be relocated. <br />Emergency Spillway <br /> <br />The emergency spillway will be vegetated earth. It ....ill be constructed <br />at the left abutment of the dam. The bottom width will be 875 feet, <br />the spillway depth is 7.0 feet and the length of level section is about <br />1,300 feet. The frequency of emergency spillway fleM is once in 5D <br />years. <br />The spillway excavation ....ill be in earth and shale. The botton will be <br />cut one foot below grade and backfilled with topsoil so that vegetation <br />can he established and the sh:lle will not be exposed. <br />Land Rights and Land Use <br /> <br />The site requires about 520 acres for the dam, emergency spillway a:ld <br />flood pool. The majority of the area is presently rangeland. There <br />are 22 acres of irrigated cropland and 120 acres of dry cropland in the <br />floodwater pool. There are no improvements in the site area except <br />the canal and diversion structure. <br /> <br />Floodwater RetardiNl Structure B-3 <br />Floodwater retarding structure B-3 is located on Coal Creek about seven <br />miles above the town of Wellington, ColoraJo. <br />Site Geology <br /> <br />BeJrock underlying the B-3 dam site consists of silty clay shale of the <br />upper part of the Pierre Formation of Upper Cretaceous age. The shale <br />is firm with little or no fracturing anJ is relatively impermeable. It <br /> <br />-24- <br /> <br />-23- <br />
The URL can be used to link to this page
Your browser does not support the video tag.