Laserfiche WebLink
<br />ove~ time, be c~eated by FEMA and communities. <br /> <br />~ <br /> <br />Hazard Identification should be accomplished on all <br />developing fans as ea~ly as possible and should follow the <br />approach ~ecommended in Section 4.5. <br /> <br />2. A Maste~ ~ should be c~eated by communities (as <br />~ecommended in Section 5) and used to ~egulate development. <br /> <br />3. Selection ~ Manaoement Tools should be made by the <br />community based on identified haza~ds, the flood management <br />map. the maste~ plan, and FEMA ~egulations and guidelines <br />(see Section 6.2). The following gene~al guidelines fo~ <br />management tool selection a~e app~op~iate. <br /> <br />Ch~nnelized Zone <br />. Development <br />measu~es a~e <br /> <br />p~ohibited <br />implemented. <br /> <br />unless <br /> <br />whole-fan <br /> <br />;. <br /> <br />B~aided ~ <br />. Basements and mobile homes p~ohibited. <br />. st~eets aligned and designed to convey enti~e <br />flood flow. <br />. Use of local dikes to direct flows into <br />st~eets. <br />. Use of d~op structu~es between homes built on <br />high slopes to p~event excessive erosion. <br />. All management tools must be coo~dinated with <br />tools in existing developments. <br />. Whole-fan management tools can be used instead <br />of the above p~ovisions. <br /> <br />Shallow Floodino ~ <br />. Elevation of st~uctures on piles or a~mo~ed <br />fi 11. <br /> <br />97 <br />