My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00770
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00770
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:21 AM
Creation date
10/4/2006 9:27:38 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
45
County
Adams
Arapahoe
Douglas
Community
Denver Metro Region
Stream Name
Big Dry Creek
Title
Major Drainageway Master Plan Big Dry Creek, Volume I
Date
6/1/1975
Designation Date
7/1/1975
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Property zoned as a flood plain (open area) and decded to a <br /> <br />governmental entity would require maintenance expenditures of ahout <br /> <br />$3,500 to $4,500 pcr mile of channcl reach annually along Big Dry <br /> <br />Creek. <br /> <br />This expenditure would be adequate for performing routine <br /> <br />maintenance, such as mowing and trash cleanup and removal. <br /> <br />\\'i thout <br /> <br />proper maintenance and management, the flood plain area could become <br /> <br />a site for refuse disposal by careless citizens, vegetative growth <br /> <br />would accelerate, and the general appearance of the flood plain would <br /> <br />become a detriment to the community. <br /> <br />C. ) <br /> <br />Plan No.2 - Structure and Chann:,:} Improvements (['Lite 7\0. 7, <br />VA 1 ume 2 ;Dr aw i ng s ) ---------~~--"~""-"-"---~- <br /> <br />l~is plan is based upon tbe making of cxtensive improvement or <br /> <br />tl10 replacemerlt of existing structures along Big Dry Creek. <br /> <br />These <br /> <br />proposed improvements and estimated costs arc tabulated in Table 1\'-4. <br /> <br />These improvements arc designed to eliminate or greatly reduce potential <br /> <br />flood damagc and property loss, as tabulated In Table 1V-3. <br /> <br />Plan No.2 - Structure and Channel Improvements illustrates the <br /> <br />reduction in the flood plain from a HIO-year frequency storm of six- <br /> <br />hour duration and proposed land use cenditions as a result of the im- <br /> <br />provements proposed in this plan. As in Plan No.1, the reduction in <br /> <br />the 10- and 25-year flood plains "ere not indicated; however, the COII1- <br /> <br />puted hydraulic results arc available in the filcs of the District. <br /> <br />In this plan, noticeable reduction in the width of the flood plllin <br /> <br />occurs at points of maxil1lum flood c1amage potential. <br /> <br />The areas of Ill;l.!!)r <br /> <br />improvement arc in channel reaches one, fivc, and seven. <br /> <br />The high <br /> <br />potential property damages in chanllel l~cach one pertain mainly to the <br /> <br />- S~- <br />
The URL can be used to link to this page
Your browser does not support the video tag.