Laserfiche WebLink
<br />GENERAL INST ALL A TION OF STRAW BALES <br />l"X2" STAKE OR <br />l"Xl" STAKE <br />WEDGE LOOSE STRAW <br />BETWEEN BALES <br /> <br /> <br />4" MIN. <br /> <br /> <br />BALES MUST BE TIGHTLY <br />ABumNG WITH NO GAPS <br /> <br />1. EXCAVATE THE TRENCH <br /> <br />2. PLACE AND STAKE STRAW BALES <br /> <br />BACKFILL MATERIAL <br />FROM TRENCH <br /> <br /> <br />I~ <br />lal~ <br />IElISIP" <br />"'1E311?'~ <br />'It- <br />3. BACKFILL AND COMPACT EXCAVATED SOIL <br /> <br />l"X2" WOOD STAKE <br />(OR !"Xl") <br /> <br /> <br />STAKED AND ENTRENCHED <br />50 LB. (APPROXIMATE) <br />STRAW BALE <br /> <br />COMPACTED SOIL TO <br />PREVENT PIPING <br />SEDIMENT LADEN RUNOFF <br /> <br />1131 <br />'~~~I I 4"(t.41N')m~ <br />-=31 SI S I Ell ElII?'6-(iiIH]TlISISI , <br />t <br />CROSS-SECTION OF A PROPERLY INSTALLED STRAW BALE <br /> <br />Figure 2 <br />