Laserfiche WebLink
<br />the IOO-ye:!r event, as well as for a maximum rekasc rate of 5,000 cf, from Chatlid<J Dam. The <br />modd was calibrated b}' adjusting Mannin{s "n" valu.:s and using high water mark information <br />from flows t.1ken during June of 1997 by the UD&FCD. The calibration run was approvcd by the <br />proj.:ctsponsorsand th.: r<:sulb incorporated into the final model. Chann.:l crass-section data was <br />t:ll.:cn from topographic mapping developed for the project This data was provided in AutoCAD <br />RI3 format as digital. three-dimensional mapping at I-foOl contours, Additional field survey data <br />WaS colkcted at each cross-s.;etilln to determine the profile of the channd bottom beneath tll\: water <br />surface. Th.: swve~'ed data was used in lieu of the mapping at each cross-section for the porrion thm <br />was below th.: wat.:r surface when the mapping was l1o'Wn, <br /> <br />total of 10 sheets arc provided depicting the 100-year 1l000ldplain, IOO-year and 5,OQ() cfs water <br />surface profiles, An index of map, heelS is also provided for reference. <br /> <br />Geomelric measurements, low chord, and invert ekvalions at bridges were lkld ,urveyed and <br />provided 10 th.: proj~'\:t sponsors by Accurate Engineering, Inc. Photographs were taken m each <br />bridge crossing and a skcteh of each was prepared showing the appropriatc dimerlsions. This <br />detailed data, in cOrljunction with the mapping, was us~-d to enter the required parameters to model <br />thcbridges. <br /> <br />Profiles of the left and right hank devations were determin.:d from the top..)graphie mapping and <br />were plotted on the profile sheets. The top of bank was takcn to bc the point at which lhechannel <br />sideslope ehallged 10 a much Oanel grade, Wh.:re such a grade break was not obvious. the inside <br />edge of the pedestrian trail was sometimes used, Bank profiles were not shown dO\\l1stream of <br />Oxford Avenue since the channelization ended at that location. These profiles provide a grapbkaI <br />representation of th.: estimated available freeboard in the ehannd. The computed water surface <br />elevation, cast and wesl bank e1evatiorls, and minimum charlnel trecboard area arc presented in Table <br />2,1 for the 100-year event. Thc minimum channel freeboard is approximately 1.4 feet near the <br />conl1uenceofBig Dry Creek. None ofthc bridges in the study reaeh arc surcharged bylhe 100-year <br />evenl. <br /> <br />Photographs were t:ll.:en to document the existing crmnnel and bank conditions f'lr determining <br />roughnesscoeffieients for use in the hydraulic analysis. This supplcmentary material is located ina <br />separate report enlitl.:d Manning',. ",," Vallie Reportjor the Sauth Plaue Rlwr Chann,", Capacity <br />(Rdcrence 2). The Manning's "n" values utilizcd in the hydraulic anal)'sis were 0025 for the <br />channel bOllom and0050 for lhe channcl banks. <br /> <br />Forcomparisonpurposcs.thc IOO-year water surface and channcl invcrt profiles generated by the <br />Corps for the original ehanncl dcsign upstream of Union Avenue was superimposed on the profile <br />sheets. The water surface c1evations were taken from the Corps HEC-2 model and adjusted 10 the <br />profiles based on locations of existing bridge and roadway crossing structures. [n addilion. the <br />vertical datum oflhe Corps watcr surface and ehanncl invert profiles were raised by 2.4 f~>t:t which is <br />the average datum difference between the 1929 map datum that the Corps uS<.-d and the 1988 datum <br />on which lh.: new mapping was prepared. Generally, the profiles indicate that the river bottom has <br />degraded downwaro (ie. the channel section deepened) since the original construction., This is <br />consislentwith survey dala whiehhasbeenreeordedovcrthepastseveral}'earsatvariou~localions <br />on the river in and adjacent tu this ,tud~ reach. This survey data is measured cach ycar by lhc <br />L'D&FCD. <br /> <br />The h}'draulie model for this study begins at Hampden Avenue and proceeds upstream 25,590 fed to <br />lhe Brown Ditch Diversion at Coal MlIle Road (txtcnded). Stationing for the mood was slart~.J at <br />16~5+26 to coincide with the report South Plall~ River Flood lfa:;urd Area Delineurion, Sand Creek <br />10 Oxford A.'enuc (Reference 3). The eh,urnc1 centerline between Hampden and Oxf<1fd '.vas <br />e<1rrelatedtothecenterlinedepicledintheaooverefcrencedrepol1toattempttokecpapproximatdy <br />the same stationing up to Oxford Avenue Cpstream ufOxford Avenue, the channel centerline and <br />stationing were taken midway betwcen the edge of water lines as depicted in the tOp(lg"~phie <br />mappingpruvided bytheprojeet~ponsors. <br /> <br />A total (If 75 eross-scctions were ,anlpled. with an average spacing of about 350 feet. Tbe cros~- <br />S<.'\:tions are identified according l() their rivtr swtiull ...,..l ..." ,hu,",'i VLI t},<: pi",; ar,,j pr0fik .ih~~ti <br />included in this repurt. The starting watcr surface e1evation for the 5,000 cfsevent wa,dctemlined <br />using the ,Iop<::-areaoption with an initial energy slope of 0.0005 and ancstimated walersurfaee <br />c1evation at Hampden Avenue. The starting water surface elevation al Hampden Avenue. as well as <br />the 100-year now rates downstream of Oxford Avenue were taken from the South Platte River <br />FHAD (Rcfcrellee I). All of Ih.: remaining l10ws for the 100-year event were taken from the model <br />used by the CDE for their channel design. The location or the eha~e in !lows were eorrcl,lled ...,.jth <br />the eross-~eetiuns u>cd in this study. The localions and values at each change in 100-y'car flo\\'S are <br />Sh\1Wnintheprofi\cs. <br /> <br />2.2 Results <br /> <br />The results of the hydraulic analysis arc ,huwn on drawings and in tables in this reporr. Drawings <br />indudcplanv\c\\'mapsandprofiles.eachindicatingl1oodelevationsand cross-s.;etion locations. A <br /> <br />, <br />