My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00707
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:51:13 AM
Creation date
10/4/2006 9:26:08 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State
Stream Name
All
Title
Report of Cherry Creek Flood Commission
Date
5/1/2013
Prepared For
State of Colorado
Prepared By
Cherry Creek Flood Commission
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br /> <br />4 <br /> <br />REPORT OF CHERRY CREEK FLOOD CO~MISSION <br /> <br />Plans Proposed for Control of Flood~Continued <br />Construction of a Number of Reservoirs.. . . . . . . . . . . . . . . . . . . . <br />Construction of a Number of Small Regulating Dams........ . . . . . <br />Regulating Dams and Concrete Conduit............ _........... <br />Construction of a Single Regulating Reservoir...... <br />The Silt Problem.. . , , . .. . . . , .. . . . . . .. . . . . . . . . . . . . . . . . . , <br />The Drift Problem. . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . <br />Use of Land within Reservoir Site. . . . . . . . . . . . . . . ',' . . . . . <br />Development of Water Supply. . . . . . . . . . . . .. . . . . . . . . . . . <br />Construction of a Small Regulating Reservoir. . . . . . . . . . . . . _ . <br />Construction of a Large Regulating Reservoir. . . . . . . . . . . . . . . . . . . <br />SummaI'y".................................... . <br />Conclusions... . .. ........... . . . . . . . . . . . . . . . .. . . . . . . . . . . <br />Recommendations... .. .... .... .. ... . . . .. .. .. .. .. .. .. <br /> <br /> <br />APPENDICES <br /> <br />Investigations and Preliminary Reports- <br />Cherry Creek Flood Commission. . . . <br />Report of August 19, 1912.. . . . . . . . . . . . . . . . . . . . . . . . . <br />Report of August 22, 1912.... .'. .. .. .. <br />Report of September 7, 1912.... . . .. .. . .. <br />Expenses and Salaries..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br />Work Done and Contemplated. . . . . . . . . <br />Flood of Mav 19 and 20, 1864 (Newspaper Clipping).. <br />Flood of July 20, 1875 (Newspaper Clipping). . . . <br />Flood of May 22, 1876 (Newspaper Clipping)... . . . . . . . . . . . <br />Movement to Confine the Channel (Newspaper Clipping). . . . . . . . . . . <br />Flood of May 22,1878 (Newspaper Clipping)...... .. <br />Flood of July 14, 1912 (Newspaper Clipping)..... . .. . <br />Precipitation Tables.. . . . . . . . . . . . <br />CastlewooQ. Reservoir. . . . . . . . . . <br />Complete Report or" Chamber of Commerce Committee. . . . . . . <br />Suits Filed Against City Based on Cherry Creek Flood. ...... . <br />Methods of Flood Relief in Foreign Countries........ . . . . . . . . . . <br /> <br /> <br />I <br /> <br />, <br /> <br />R,EPORT OF CHERRY CREEK FLOOD COMMISST <br /> <br />Page <br /> <br />67 <br />68 <br />68 <br />69 <br />74 <br />77 <br />77 <br />79 <br />79 <br />80 <br />81 <br />83 <br />86 <br /> <br />Letter of Transmittal <br /> <br />Denver, Colo" May 20, ] <br /> <br />The Honorable Board of Public Work., <br />City and County of Denver. <br /> <br />GENTLEMEN: Herewith is submitted a report concerni <br />proposed regulation and control, of Cherry Creek floods <br />report cannot be considered as complete, since the investig <br />and surveys have not been made in as great detail as'is des <br />It is believed, however, that investigations have proceedel <br />point where further study would merely serve to confirm tl <br />clusions now reached. We are of the opinion, therefore, th <br />conclusions arrived at in this report would not be mat. <br />mod,ified by further study, which would have in view the we <br />out'of details rather than arrival at general conclusions. <br />In accordance with your instructions, we have endeavo <br />compile this report at the lowest possible cost. It ShOl <br />stated, however, that we have had a number of requests for <br />of this report, and we recommend that the report be print <br />order that it may be discussed by the puhlic with a hetter . <br />standing than would be possible if conclusions alone were <br />public, <br />In submitting this report, we desire to express our ohlil <br />to the Pittsburg Flood Commission, whose report has b, <br />great assistance to us in compiling ours. Not only ha' <br />abstracted'one of the appendices of this report in its entiret <br />we have adopted to a great extent the conclusions contair <br />the Pitts burg flood report, using them as a model for our 0 <br /> <br />Respectfully suhmitted, <br /> <br />91 <br />92 <br />94 <br />98 <br />101 <br />102 <br />107 <br />110 <br />111 <br />111 <br />113 <br />115 <br />117 <br />120 <br />123 <br />133 <br />138 <br /> <br />A. I,INCOLN FELLO <br />J. B. HUNTER, <br />C. A. TREASE, <br />Cherry Creek Flood Commiss <br />
The URL can be used to link to this page
Your browser does not support the video tag.