My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00669
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:35 PM
Creation date
10/4/2006 9:25:04 PM
Metadata
Fields
Template:
Floodplain Documents
County
Broomfield
Community
Broomfield
Stream Name
Missen Reservoir Channel
Title
LOMR - Affected Panel 085073 0091 F - Case No. 05-08-0261P
Date
6/9/2005
Prepared For
Broomfield
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 of 4 I Issue Date: JUN 0 9 2005 I Effective Date: <br /> <br />JUN 0 9 2005 I Case No.: 05-08-0261P I LOMR.APP <br /> <br />~iAR'I:Ar~ <br /> <br />:J.~~~ <br />'f, 't; <br />'lo' ~j <br />;&-l<1'lVD siCY <br /> <br />Federal Emergency Management Agency <br />Washington, D,C. 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULA nONS/COMMUNITY OBLIGA nON <br /> <br />We have made this determination pursuant to Section 206 ofthe Flood Disaster Protection Act of 1973 (P.L. 93.234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, <br />P,L. 90.448), 42 U,S.C, 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or <br />exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements <br />to which the regulations apply, <br /> <br />We provide the f100dway desiguation to your community as a tool to regulate floodplain development. Therefore, the f100dway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3( d) of the NFIP regulations. <br /> <br />NFIP regulations Subparagraph 60,3(b )(7) requires communities to ensure that the f1ood.carrying capacity within the altered or relocated <br />portion of any watercourse is maintained. This provision is incorporated into your community's existing floodplain management <br />ordinances; therefore, responsibility for maintenance of the modified channel and culvert rests with your community. We may request <br />that your community submit a description and schedule of channel and culvert activities. <br /> <br />COMMUNITY REMINDERS <br /> <br />We based this determination on the I-percent-annual-chance flood discharges computed in the FIS for your community without <br />considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects <br />upstream could cause increased flood discharges, which could cause increased flood hazards. A comprehensive restudy of your <br />community's flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of <br />the FIS report for your community and could, therefore, establish greater flood hazards in this area, <br /> <br />Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or <br />State/Commonwealth law have been obtained, State/Commonwealth or community officials, based on knowledge of local conditions and <br />in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your <br />State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take <br />precedence over the minimum NFIP requirements. <br /> <br />This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If <br />you have any questions about this document. please contact the FEMA Map Assistance Center toll free at 1-877-336-2627 (1-877-FEMA MAP) or by letter <br />addressed to the LOMR Depot, 3601 Eisenhower Avenue, Alexandria. VA 22304. Additional information about the NFIP is available on our website at <br />http://www.fema.gov/nfip. <br /> <br />a~4 <br /> <br />Patrick F. Sacbibit, P.E., CFM. Project Engineer <br />Hazard IdentificatIon Section <br />Mitigation Division <br />Emeraencv Preoaredness and ResDonse Directorate <br /> <br />10563410.3.4.01,05080261 1021AC <br />
The URL can be used to link to this page
Your browser does not support the video tag.