My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00668
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00668
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:11:45 AM
Creation date
10/4/2006 9:25:00 PM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Douglas
Community
Englewood, Littleton, Greenwood Village
Stream Name
Big Dry Creek
Title
Major Drainageway Master Plan
Date
6/1/1975
Prepared For
Englewood, Littleton, Greenwood Village
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE NO. <br /> <br />J1-l <br /> <br />II1-l <br /> <br />III-2 <br />IV-I <br /> <br />IV-2 <br /> <br />IV-3 <br /> <br />IV-4 <br /> <br />IV-5 <br /> <br />IV-6 <br /> <br />IV-7 <br /> <br />JV-8 <br /> <br />VIOl <br /> <br />LIST OF TABLES <br /> <br />II TI. E <br /> <br />Soils Groupings - Douglas County . <br /> <br />Determination of effective rainfall <br /> <br />Peak rates of storm runoff <br /> <br />Drainage structure information <br /> <br />Potential flood damage and estimated costs <br />Plan No. 1 - Flood Plain Delineation <br /> <br />Potential flood damage <br />Plan No. 2 - Structure <br />men t s ... <br /> <br />and estimated costs <br />and Channel Improve- <br /> <br />Propose d <br />Plan No. <br />ments <br /> <br />improvements and estimated costs <br />2 - Structure and Channel lmprove- <br /> <br />Benefit/Cost Analysis, Plan No, 2 - Struc- <br />ture and Channel Improvements <br /> <br />Potential flood damage and estimated costs 63 <br />Plan No. 3 - l'lood Control Dam and Structure <br />and Channel Improvements . <br /> <br />Proposed improvement:; aud estimated costs <br />Plan No. 3 - Flood Control Dam and Struc' <br />ture and Channel Imprc'vements .... <br /> <br />Benefit/Cost Analysis 68 <br />Plan No.3 - Flood Control Dam and Structure <br />and Channel Improvements <br /> <br />Floodway Table . <br /> <br />PAGE <br /> <br />21 <br />25 <br /> <br />34 <br /> <br />44 <br /> <br />50 <br /> <br />54 <br /> <br />56 <br /> <br />59 <br /> <br />65 <br /> <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.