My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00654
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00654
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:37 PM
Creation date
10/4/2006 9:24:50 PM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Lakewood
Stream Name
Lena Gulch
Title
LOMR - Affected Panel 085075 0005 C - Case No. 94-08-086P
Date
5/23/1994
Prepared For
Lakewood
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />West 20th Avenue. <br /> <br />The aforementioned five-cell box culvert and floodwall <br /> <br />contain the 10-, 50-, and 100-year floods. <br /> <br />The table below indicates the <br /> <br />modified BFEs for several locations along the affected <br /> <br />Existing BFE <br />Location (Feet)* <br /> <br />length of Lena Gulch. <br /> <br />Modified BFE <br />(Feee)* <br /> <br />Maple Grove Reservoir 5,531 5,531 <br />Just downstream of West 20th Avenue 5,531 5,535 <br />Just upstream of West 20th Avenue 5,542 5,538 <br />Approximately 400 feet upstream of <br />West 20th Avenue 5,542 5,540 <br />Approximately 700 feet upstream of <br />West 20th Avenue 5,543 5,543 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildings and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the community, that the Mitigation Directorate <br /> <br />reconsider the determination. Any request for reconsideration must be based <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day period elapses, the <br /> <br />Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.