Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br /> <br />IV. CAPACITY TO COMPLETE THE PROJECT <br /> <br />The LA staff includes nine (9) professionals and three (3) administrative and technical <br />support personnel. LA has all of the production tools required for efficient and accurate <br />engineering services, including CADD work stations (AutoCAD/DCA Softdesk Version 12) for <br />streamlining the production of design drawings and graphics displays, PC-based word processing <br />for preparing reports and contract documents, and PC work stations for engineering production <br />and modeling. LA is proud of its reputation to complete projects on time and within budgetary <br />constraints. <br />Given the task definition provided in the Request for Letter of Qualifications and Interest, <br />and assuming the existing information cited is readily available, we believe that the project can <br />realistically be completed within the 4 to 6 month time frame for the anticipated budget of <br />$40,000 to $50,000. Given LA's projected workload and our existing staff, the project budget <br />for the Flood Control and Drainage Project Prioritization Analyses represents less than 7 percent <br />of our required workload for 1995. Consequently, we are confident that we can provide the <br />level of effort necessary to provide a timely, cost effective and professional work product that <br />meets or exceeds the expectations of the Public Works Department. <br /> <br />23 <br />