My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00588
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00588
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:37:46 PM
Creation date
10/4/2006 9:22:55 PM
Metadata
Fields
Template:
Floodplain Documents
County
Delta
Community
Orchard City
Title
FIS - Orchard City
Date
1/16/1981
Prepared For
Delta County
Prepared By
FEMA
Floodplain - Doc Type
Current FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FLOOD INSURANCE STUDY <br /> <br />1.0 INTRODUCTION <br /> <br />1.1 Purpose of Study <br /> <br />The purpose of this Flood Insurance Study is to investigate the <br />existence and severity of flood hazards in the City of Orchard <br />City, Delta County, Colorado, and to aid in the administration <br />of the National Flood Insurance Act of 1968 and the Flood Disaster <br />Protection Act of 1973. Initial use of this information will <br />be to convert Orchard City to the regular program of flood insur- <br />ance by the Federal Insurance Administration. Further use of <br />the information will be made by local and regional planners to <br />promote sound land use and flood plain development. <br /> <br />1.2 Coordination <br /> <br />An initial coordination meeting was held in Orchard City on March <br />23, 1978. This meeting, attended by representatives of the City <br />of Orchard City, the Federal Insurance Administration, and the <br />study contractor, was held to discuss the nature and purpose of <br />the study and the scope and limits of work. <br /> <br />On January 25, 1979, an intermediate coordination meeting was <br />held to discuss the progress of the study and the limits of work. <br />In attendance were representatives of Orchard City, the Federal <br />Insurance Administration, the study contractor, and Delta County. <br /> <br />The U.S. Geological Survey and the Colorado Water Conservation <br />Board (State Coordinator) were contacted to obtain information <br />needed in the preparation of this study. <br /> <br />The results of this study were reviewed at a final community coordi- <br />nation meeting held on September 4, 1980. Attending the meeting <br />were representatives of the Federal Insurance Administration, <br />the study contractor, and the city. No problems were raised at <br />the meeting. <br /> <br />1.3 Authority and Acknowledgments <br /> <br />The source of authority for this Flood Insurance Study is the <br />National Flood Insurance Act of 1968, as amended. <br /> <br />The hydrologic and hydraulic analyses for this study were performed <br />by MSM Consultants, Inc., for the Federal Insurance Administration, <br />under Contract No. H-47l0. This work, which was completed in <br />October 1979, covered all significant flooding sources affecting <br />the City of Orchard City. <br />
The URL can be used to link to this page
Your browser does not support the video tag.