My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00548
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00548
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:48:43 PM
Creation date
10/4/2006 9:21:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Rio Blanco
Community
Meeker
Stream Name
Sulphur Creek
Title
Meeker Sulphur Creek Flood Control Project Phase II Improvements Construction Contract Documents and Technical Specifications
Date
6/1/1993
Prepared For
Meeker
Prepared By
Enartech, Inc.
Floodplain - Doc Type
Contract
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />AGREEMENT <br /> <br /> <br />THIS AGREEMENT, made this <br /> <br />day of <br /> <br />. 19 <br /> <br />. by <br /> <br />and between <br /> <br />the Town of Meeker <br /> <br />hereinafter called "OWNER" <br /> <br />(Name o! O.....ner). (an Individual) <br /> <br />and <br /> <br />doing business as (an individual.) or (a <br /> <br />partnership.) or (a corporation) hereinafter called "CONTRACTOR". <br />WITNESSETH: That for and in consideration of the payments and agreements herein- <br /> <br />after menlioned: <br /> <br />1. The CONTRACTOR will commence and complete the construction of <br /> <br />the Sulohur Creek Flood Control Proiect - Phase II Improvements <br /> <br />2. The CONTRACTOR will furnish all of the material, supplies, tools. equipment. <br /> <br />labor and other services necessary for the construction and completion of the PROJECT <br /> <br />described herein. <br /> <br />3. The CONTRACTOR will commence the work required by the CONTRACT DOC- <br /> <br />UMENTS within <br /> <br />10 <br /> <br />calendar days after the date of the NOTICE TO PRO- <br /> <br />CEED and will complete the same within <br /> <br />70 <br /> <br />calendar days unless the period <br /> <br />for completion is extended otherwise by the CONTRACT DOCUMENTS. <br /> <br /> <br />4, The CONTRACTOR agrees to perform all of the WORK described in the CON- <br /> <br /> <br />TRACT DOCUMENTS and comply with the terms Iherein for the sum of $ <br /> <br />or as shown in the BID schedule. <br /> <br />5. The term "CON,TRACT DOCUMENTS" means and includes the following: <br />(A) Advertisement For BIDS <br /> <br />(B) Information For BIDDERS <br /> <br />(C) BID <br />(D) BID BOND <br />(El Agreement <br /> <br />CONTRACT DOCUMENTS FoR CQNSmUC"TIQN OF <br />FEDERALLY ASSISTED WATER AND .sEWER PROJECTS <br /> <br />Document No_ 5 <br />Agreement: Page 1 01 J <br />
The URL can be used to link to this page
Your browser does not support the video tag.