Laserfiche WebLink
<br />problem is aiso an important consideration in selectinu what hydrologic method to use, The required <br />level of accuracy is usually dependent on the scale or complexity of the problem beinu solved, <br />Designing a simple highway culvert is obviously going to entail less detail than designing a large, high <br />hazard dam, Table 6,1 shows general design criteria for various water-control structures,(Chow, <br />1988), <br /> <br />Tabl,e 6,1 <br />Design Criteria for Various Water Control Projects <br /> <br />Colorado Flood <br />Hydrology Manual <br /> <br />E' -, <br />),1 <br /> <br />DRAFT <br />