Laserfiche WebLink
<br />e <br /> <br />t <br /> <br />e <br /> <br />. <br /> <br />~ <br /> <br />e <br /> <br />, <br /> <br />PAGE 3-7 <br /> <br /> <br />Limitations on FMA Planning Grant Amounts <br /> <br />Chapter 6 of this guidance explains the statutory limitations that <br />the NFIRA places on the total FMA assistance available for <br />planning, technical assistance, and project grants. Applications <br />approved by the State must consider these limitations. <br /> <br />FEMA 2Q9/AuOUST 1997 FLOOD MITIGATION ASSISTANCE (FMA) GUIDANCE <br />