Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />INTRODUCTION <br /> <br />Authorization <br /> <br />The CWCB has eertain statutory responsibilities relating to the designation and approval of <br />floodwater runoff ehannels or basins as follows: <br /> <br />... "to devise and formulate methods, means, and plans for bringing about the greater <br />utilization of the waters of the state and the prevention of flood damages therefrom, and to <br />designate and approve storm or floodwater runoff ehannels or basins, and to make sueh <br />designations available to legislative bodies of eities and ineorporated towns, to eounty <br />plamling eommissions, and to boards of adjustment of eities, ineorporated towns, and <br />eounties of this state...," Seetion 37-60-106(1)(e) of the Colorado Revised Statues (CRS). <br /> <br />A CWCB designation and approval of eUITent floodplain information is needed for the ineorporated <br />areas of the Town of Otis, Colorado. The CWCB has prepared this report to permit the designation <br />of the approximate floodplain information eontained in the Town of Otis FIRM, as revised by the <br />CWCB, so that the eommunity ean better implement its floodplain management program. <br /> <br />Purpose and Scope <br /> <br />This Floodplain Information Report (FIR) was prepared to revise the Town of Otis FIRM, dated <br />August 19, 1985, and to provide supporting doeumentation for the approximate 100-year floodplain <br />boundaries shown on the revised FIRM. FEMA did not provide engineering information to support <br />the approximate floodplain delineations shown on the FIRM. This report provides limited <br />engineering information to fulfill that need. <br /> <br />This FIR includes: <br /> <br />I. Authorization for the report and its purpose and seope; <br /> <br />2. Study area deseription including information on the eommunity, the watershed, any known <br />flooding historylflooding problems, previous studies and projeets, and eommunity response to <br />the CWCB designation and approval process; <br /> <br />3. Deseription of hydrologic and hydraulie information; and <br /> <br />4. Floodplain management program. <br />