Laserfiche WebLink
<br />-... ~ <br /> <br />. <br /> <br />. <br /> <br />" <br />Ii <br />11 <br /> <br />Issues to be addressed are: <br /> <br />. Status regarding the Flatiron Levee Certification application; <br />· Status reports regarding the flood hazard determinations from the resource interests; <br />- Flatiron Company <br />- UD&FCD <br />- University of Colorado <br />- FEMA <br />. What should be the 100- year floodplain for the 1997 flood season?; <br />· Do we want to consider rnaking a public notice to the residents who are located in the natural <br />South Boulder Crcek Floodplain regarding the purchase of flood insurance the near future?; <br />· Review the compatibility of the Reclamation Plan and the Flood Mitigation Plan; and <br />. Others. <br /> <br />The purpose of the meeting is I) to determine the status of a number of engineering <br />investigations which are in progress for the subject site and 2) what actions should bc <br />considered in preparation for the 1997 flood season within thc South Boulder Creck Floodplain. <br /> <br />I welcome your participation in addressing these floodplain issues. <br /> <br /> <br />t ;fr; <br /> <br />Larry L g, Chief <br />Floodplain Management and <br />Flood Control Section <br /> <br />cc. Daries "Chuck" Lile Director, CWCB <br />(see attached list) <br /> <br />a:cumetin2.doc <br />