Laserfiche WebLink
<br />Issues to bc addressed are: <br /> <br />. Status regarding the Flatiron Levee Certification application; <br />. Status reports regarding the flood hazard determinations from the resource interests; <br />- Flatiron Company <br />- UD&FCD <br />- University of Colorado <br />- FEMA <br />. What should be the 100- year floodplain for the 1997 flood season?; <br />. Do we want to consider making a public notice to the residents who are located in the natural <br />South Boulder Creek Floodplain regarding the purchase of flood insurance the near future?; <br />. Review the compatibility of the Rcclamation Plan and the Flood Mitigation Plan; and <br />. Others. <br /> <br />The purpose of the meeting is I) to determine the status of a number of engineering <br />investigations which are in progress for the subject site and 2) what actions should be <br />considered in preparation for the 1997 flood season within the South Boulder Creek Floodplain. <br /> <br />I welcome your participation in addressing these floodplain issues. <br /> <br /> <br />Chief <br />Floodpl . Management and <br />Flood Control Section <br /> <br />cc. Daries "Chuck" Lile Director, CWCB <br />(see attached list) <br /> <br />a:cumetin5.doc <br />