Laserfiche WebLink
<br />" <br /> <br />Page 4 <br /> <br />14. "Floodplain management" means the operation of an. overall <br />program of corrective and preventive measures for reducing <br />flood damage, including, but not limited to, zoning or <br />land-use regulations, flood control works, and emergency <br />preparedness plans. <br /> <br />15. "Floodplain management regulations. mean zoning <br />ordinances, subdivision regulations, building codes, health <br />regulations, special purpose ordinances (such as a <br />floodplain ordinance, grading ordinance, or erosion control <br />ordinance) and other applications of police power. The <br />term describes such state or local regulations, in any <br />combination thereof, which provide standards for the <br />purpose of flood damage prevention and reduction. <br /> <br />16. "Flooded area map" means a drawing which shows in plan <br />view the horizontal boundary of floods of various <br />magnitudes or frequencies. Such maps include, but are not <br />limited to, Flood Hazard Boundary Maps (FHBM) and Flood <br />Insurance Rate Maps (FIRM) pUblished by FEMA, Floodprone <br />Area Maps published by the U.S. Geological Survey (USGS). <br />Flooded Area Maps published by the Corps of Engineers <br />(COE), Flood Hazard Area Maps published by tbe U.S. Soil <br />Conservation Service (SCS), Flooded Area Maps published by <br />the Board, and Flood Hazard Area Delineations (FHAD) <br />published by the Urban Drainage and Flood Control District <br />(UD&FCD) . <br /> <br />17. "Foreseeable development" means the potential future <br />development of, or changes in, the land uses that are <br />likely to take place during the period of time covered by a <br />community's adopted master land use plan, or over a 20-year <br />period, whichever is longer. <br /> <br />lB. "Freeboard" means the vertical distance in feet above'a <br />predicted water surface elevation which is intended to <br />provide a margin of safety to compensate for the many <br />unknown factors that could contribute to flood heights <br />greater than the height calculated for a selected size <br />flood such as wave action, bridge openings, and the <br />hydrological effect of urbanjzation of the watershed. <br /> <br />19. "HEC-2" means the most recently revised version of the <br />computer program developed by the U.S. Army Corps of <br />Engineer's (CDE) Hydraulic Engineering Center (HEC) for <br />calculating flood water surface elevations. <br /> <br />2 CCR 408-1 <br /> <br />_A___ <br />f~.\ <br />/!r "S <br />F. i'JlC: ~ <br />,~) <br />_~-'T" <br />THE CODE OF COLORADO REGULATIONS \--:..~ <br /> <br />. <br /> <br />L <br />