My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00285
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00285
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:50:44 AM
Creation date
10/4/2006 9:11:22 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State
Stream Name
All
Title
Floodplain Designation and Approval
Date
12/11/1987
Prepared For
State of Colorado
Prepared By
CWCB
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />{ 1988 THE PUBLIC RECORD CORPORATION <br />A.LL RIGHTS RESERVED <br /> <br />lICRI. 1-88 <br /> <br />Page 11 <br /> <br />4. WorK in Proqress. Where construction of pUblicly owne~, <br />operated and maintained flood control structure will not be <br />completed within 12 months following completion of the <br />report, but adequate progress has been made, the impact of <br />the project shall be included in the hydrologic analysis. <br /> <br />5. Detention. The hydrologic analysis shall consider the <br />effects of on-site detention for rooftops, parking lots, <br />highways, road fills, railroad embankments, diversion dams, <br />refu.se embankments (e.g., solid waste disposal facilities), <br />mill tailings impoundments, siltation ponds, livestock <br />water tanks, erosion control dams, or other structures <br />only if they have been designed and constructed with the <br />purpose of impounding water for flood detention and are <br />owned, operated, and maintained by a government body. <br />Detention structures that are randomly located, privately <br />owned, or privately maintained shall not be included in the <br />hydrologic analyses unless it can be shown that they <br />exacerbate downstream peak discharges. <br /> <br />6. Previ ous Studi es. Where appropr; ate, ava i1 ab 1 e <br />floodflow-frequency information shall be used so that <br />previous work by Federal, State, or local agencies shall <br />not be duplicated. Where such data are not ava~lable, <br />where conditions have changed significantly, or where the <br />methodologies or data used in previous studies are not <br />appropriate, a new hydrologic analysis for each stream <br />shall be prepared. <br /> <br />A comparison of any proposed discharges with all published <br />or unpublished floodflow. frequency data that exist for the <br />study area shall be provided to the Board. <br /> <br />se <br />used in previously completed studies on the same <br />watercourse. The results of a later floodflow.frequency <br />analysis shall be considered, where they disagree with <br />discharges used in completed studies, only when they can be <br />shown to be significantly different statistically than the <br />previously used discharges. The test for significance <br />shall be based on the' confidence 1 imi ts of the 1 atest <br />analysis, as described below. <br /> <br /> <br /> <br />THE CODE OF COLORADO REGULATIONS <br /> <br />2 CCR 408.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.