My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00281
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:58 PM
Creation date
10/4/2006 9:11:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Title
Design Criteria and Construction Specifications volume 2 of 5 Storm Drainage Criteria
Date
10/1/1997
Prepared For
Greeley
Prepared By
Department of Public Works
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br /> <br />2. <br /> <br />Concrete side slopes shall be extended to include the <br />freeboard height. <br /> <br />b. Super-elevation - Super-elevation of the water surface <br />shall be determined at all horizontal curves, and design <br />of the channel section adjusted accordingly. <br /> <br />c. Velocities - Flow velocities shall be such that critical <br />or super critical flow conditions are not created. In no <br />case shall the velocity exceed 18 fps. <br /> <br />Concrete Materials (Small Drainageway) <br /> <br />a. Cement type: Sulphate resistant. <br /> <br />b. Minimum cement content: 550 lbs/CY <br /> <br />c. Maximum water content: 0.50 (six gallons per sack) <br /> <br />d. Maximum aggregate size: l~ inches <br /> <br />e. Air content range: 4% to 7% <br /> <br />f. Slump: 2 to 4 inches <br />g. Minimum compressive strength (fIe): 3,750 psi @ 28 days <br /> <br />3. <br /> <br />Concrete Lining section (Small Drainageway) <br /> <br />a. All concrete lining shall have a sufficient thickness to <br />withstand the structural and hydraulic loads. <br /> <br />b. The side slopes shall be a maximum of 2 vertical to 1 <br />horizontal, or be designed as a structurally reinforced <br />retaining wall, if steeper. <br /> <br />4. <br /> <br />Concrete Joints (Small Drainageway) <br /> <br />a. Expansion joints shall be installed where new concrete <br />lining is connected to a rigid structure or to existing <br />concrete lining which is not continuously reinforced. <br /> <br />b. Longitudinal joints, where required, shall be constructed <br />on the side walls at least one foot vertically above the <br />channel invert. <br /> <br />c. All joints shall be designed to prevent differential <br />movement. <br /> <br />d. Construction joints are required for all cold joints and <br />where the lining thickness changes. <br /> <br />5 - 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.