My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00281
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:58 PM
Creation date
10/4/2006 9:11:07 PM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Title
Design Criteria and Construction Specifications volume 2 of 5 Storm Drainage Criteria
Date
10/1/1997
Prepared For
Greeley
Prepared By
Department of Public Works
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
185
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The lOa-year runoff shall be computed at the point where the major <br />drainage path enters thE! proposed development and a(]ain where the <br />major drainage path leavl=s the development. Intermediate points of <br />runoff shall be computed where deemed critical and to better define <br />the major drainage path. Critical points are ':Jenerally identified <br />by the intersection of a drainage path with the najor drainage <br />path, rapid changes in grades or channel widt.hs. Th,e runoff shall <br />be based on the total ar,=,a tributary to the runoff point regardless <br />of the ratio of developed area to the drainage basin. <br /> <br />The width of the chann,=,l and maintenance access to the channel <br />shall be as defined in Section 5.0-0pen Channels. No development <br />will be allowed within this designated area. :3aid area shall be <br />called a drainage right-cof-way and identified as such on all plans <br />and plats. The drainage right-of-way shall be dedicated to the <br />city for public use. Access roads shall be dedicated to the city <br />where necessary. <br /> <br />Where possible and as ['equired by the City, t~he major drainage <br />channels shall be incorporated into greenbelt and recreational <br />areas. Natural drainaqe chann<:ls lend themse,lves to gre<:nbelt <br />areas. Where the width can be extended, hiking trails, pedestrian <br />walkways and bicycle paths should be located in the major drainage <br />path. Due consideration should be given to street and utility <br />layout to gain maximum aesthetic use of the drainage path. <br /> <br />The initial and major storm frequencies to be used for runoff <br />analysis and the subsequent design of stormwater cont:rol facilities <br />in the City of Greeley are presented below: <br /> <br /> - <br /> DESIGN STORK FREQUENCIES <br /> LaneS Use Initial S <br /> Frequen <br /> Residential 2-year <br /> - <br />commercial, Business & 5-year <br /> Industrial <br />Downtown Business Area~ Airport la-yea <br />Terminals and Industrial (1 ) <br /> <br />:I Major Storm <br />Frequency <br /> lOa-year <br /> loa-year <br /> lao-year <br /> <br />to <br />cy <br /> <br />r <br /> <br />(1) Any industrial development within or adjace,nt to airport <br />terminals or the dmmtown business area shall have an initial <br />storm frequency of la-years. <br /> <br />3 - 2 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.