My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00275
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:21:58 PM
Creation date
10/4/2006 9:10:58 PM
Metadata
Fields
Template:
Floodplain Documents
County
Adams
Community
Westminster
Title
Bruchez Farms Property - Big Dry Creek at Wadsworth Parkway
Date
1/1/1998
Prepared For
Bruchez Farm
Prepared By
Wright Water Engineers Inc
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Rule 9. Desiqnation and Approval of Floodplain Information: <br /> <br />A. Desianation and Approval Reauirements. The Board will <br />designate and approve floodplains and storm or floodwater <br />runoff channel~ by the adoption of written resolutions b33ed <br />only upon such t oodplain information as the Board determines <br />meets the standards set forth in rule 5 or rule 6, as <br />applicable, with 60nsideration of the effects of dams and <br />levees being subject to the criteria of rules 7 and 8, <br />respectively. <br /> <br />B. Base Flood. The IOO-year flood shall be the basis for all <br />designations and approvals by the Board, for zoning purposes, <br />of floodplains and of storm or floodwater runoff channels in <br />Colorado. <br /> <br />C. Conditions. All designations and approval~ of approximate <br />floodplain information by the Board shall 5Jecify that the <br />community may not exercise its zoning powers based on the <br />Board's designation unless it includes in its zoning ordinances <br />or regulations the requirement that there be a case-by-case <br />review with a detailed hydrologic and hydraulic investigation <br />for rezoning and development activities within the approximate <br />IOO-year floodplain. <br /> <br />D. Process for Takina Desianation and Approval Actions. The <br />Board may consider the designation and approval of floodplain <br />information either by request of a community or by acting on <br />its own initiative. <br /> <br />1. Consideration at a Communi tv's Reauest. The Board shall <br />consider designation and approval of floodplain information <br />upon written request from the governing body of any <br />community having jurisdiction in the area where the <br />floodplain information is applicable. The letter of <br />request shall identify the report title, date, author or <br />agency which prepared the report, stream name(s), upstream <br />and downstream limits of the stream reach(es) to be <br />designated, stream length(s) in miles, type of designation <br />requested (detailed or approximate), and any other relevant <br />i nformat ion. Such request must be recei ved by t~e Board at <br />~ 1 Efa.st 30 days prior to~ the Board meeting at which <br />consideration of designation and approval is requested.. <br /> <br />-22- <br />
The URL can be used to link to this page
Your browser does not support the video tag.