Laserfiche WebLink
<br />in Dolores. <br /> <br />All of this eXDerlence reflects federal Waoe <br /> <br />rates and construction costs (Davis-Bacon provisions). <br /> <br />TABLE 2 <br /> <br />Dolores River at Do:ores <br /> <br />Summary of Unit Construction Costs <br /> <br />Item <br /> <br />Un:L t s <br /> <br />Unit Costs <br /> <br />Levee Excavation <br />Levee Embankment <br />RiDrap (stone) <br />Concrete (in place <br />Construction Contingencies <br />Enqineering and <br />Administration Fee <br /> <br />C.Y. <br /> <br />~:. y . <br /> <br />S 2.flO <br />5.00 <br />40.00 <br />250.00 <br />20\, <br />12 ~; <br /> <br />C.Y. <br />C.Y. <br />Per-cent <br />Percent <br /> <br />Right-af-way costs were not consloered in ~his cost <br />E:stimate. It was assumed that the town 0: Dolo1:-es would <br />acquire construction, access, and use easements ~~rom <br />property owners along the levee alignments in exchange for <br />benefits to them from the projec~. <br /> <br />Project costs are listed in Table 3 (North side) and <br />Table 4 (South side). ~hey a~e broken down by sections and <br />sJbsections and by the various construction functions for <br />ea.ch portion. The various sec:.ions and subsections are <br /> <br />S!lown on plates 5a anc ~o. <br /> <br />~~~ b~~:~~i~; an6 enc:~s <br /> <br />s~:ations for each por~ion a~e given in Tables 3 2~a 4 to <br />ftlrther clarify their loca~io~. <br /> <br />-15- <br />