Laserfiche WebLink
<br />; <br /> <br />Coordination <br /> <br />Ini tial coordination h'i th local interests should identify areas <br />\.an:U"'1ting special considerations in the floodway delineatio~. These <br />areas could include: <br /> <br />01. Private lands \,'here the flood plain on both sides of <br />stream is under conmon ohnership and the O\\11er has a preferred <br />}.::::c:::.tioTl fer the floodh'ay, <br /> <br />C 2. :\Teas \,;here lecal and moral lard-use cOITTlitnents of <br />local officials preempt flood,,:ay cpt ions , <br /> <br />C3. <br /> <br />Public Darks, c:reenwavs 3..11d nreservaticn areas h'here <br />h-ill not be considered for the Lood plains, <br /> <br />ce\-e lcpment <br /> <br />64. Partially developed area.s "here zoning or other <br />re6ulation progr&~ demand special placement of flo~mvay for overall <br />consistency in their programs, and <br /> <br />05. High valued flood plain complexes where floodway sur- <br />charges could result in significant damages. <br /> <br />Final Coordination. At the conclusion of the initial floomvay <br />desiqn the results should be coordinated with all interested <br />agen~i~s, especially the local officials. In.some ca~es ~t \vill <br />be necessary to realign the floodway after thls coordlnatlOn to <br />avoid conflicts with the local requirements. <br /> <br />s <br />