Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TABLE V-4 <br /> <br />1 COST SUMMARY BY JURISTICTION BASED ON CONTRIBUTORY CAUSES <br />TO FLOOD PROBLEMS <br /> <br /> TOTAL DENVER LAKEWOOD <br />TRIBUTARY COST CONSTR. COST R.O.W. TOTAL CONSTR. COST R.O.W. TOTAL <br />1st AVENUE $1, 707 ,435 $472,757 $100,770 $573,527 $ 934,678 $199,230 $1,133,908 <br />DAKOTA 608,149 26,604 3,743 30,347 506,544 71,258 577 ,802 <br />DEPEW 978,062 0 0 0 963,062 15,000 978,062 <br />TOTALS $3,293,646 $499,361 $104,513 $603,874 $2,404,284 $285,488 $2,689,772 <br /> <br />1 <br />ANNUAL MAINTENANCE (ENGINEERING AND CONTINGENCIES AND FISCAL, LEGAL AND ADMINISTRATIVE COST) INCLUDED IN CONSTRUCTION COST <br /> <br />V-4 <br />