Laserfiche WebLink
<br />. <br />. <br />. <br />. <br />. <br />I <br />I <br />'. <br />I <br />. <br />I <br />I <br />I <br />. <br />I <br />I <br />I <br />I <br />I <br /> <br />COLORADO WATER CONSERVATION SD;',W <br />823 STATE CENTENNIAL BUILDING <br />1313 SHERMAN STREET i <br />DENVER, COLORADO 80203 . <br /> <br />OfFiCiAL copy <br /> <br />EI <br /> <br />CENTENNIAL ENGINEERING, INC. 11405 WEST 48TH AVENUE, WHEAT RIDGE, COLORADO 80033, (303) 420-0220 <br /> <br />July 28, 1978 <br /> <br />Mr. L. Scott Tucker <br />Executive Director <br />Urban Drainage and Flood Control District <br />2480 West 26th Avenue, Suite 156 B <br />Denver, Colorado 80211 <br /> <br />RE: Weir Gulch Tributaries <br />Major Drainageway Planning <br />Phase B Report - eEl 6034 <br /> <br />Dear Mr. Tucker: <br /> <br />The Phase B report, entitled "Major Drainageway Planning Weir <br />Gulch Tributaries", is attached. The purpose of this part of <br />the report is to prepare a preliminary design and cost estimate <br />in accordance with the recommendations of the Phase A report, <br />comments received with the notice to proceed and during review <br />meetings with the sponsors. <br /> <br />The preliminary design and cost estimate is in sufficient detail <br />to permit the municipalities to adequately plan improvements <br />and future developments within the study area. <br /> <br />We wish to extend our appreciation to Mr. Urbonas of your staff, <br />to Mr. Skifalides and Mr. Barsoom of the City of Denver and <br />to Mr. Goebel and Mr. Skinner of the City of Lakewood, for the <br />cooperation we have received during the execution of the Phase B <br />portion of this study. <br /> <br />We have appreciated the opportunity to work on this study and <br />remain available for implementation of this master plan. <br /> <br />Very truly yours, <br /> <br />C~ENNIAL ENGINEERING, INC. <br /> <br />i::LJ/ l_fpi'Le~' <br /> <br />Richard F. Sparlin, P.E. <br />Vi ce Pres i dent <br /> <br />\~d ~. WU <br /> <br />Gerhard E. Hentschel, P.E.-L.S. <br />Project Engineer <br /> <br />RFS/GEH:vp <br />Enclosure <br />