Laserfiche WebLink
<br />TABLE 5 <br /> <br />Approximate Information Which Is Consistent With Previouslv Prepared Detailed Information <br />Which Was Designated bv Resolutions Adopted Prior to Resolution No. 93-334 <br /> <br />Stream Reach <br /> <br />Previous Designation <br /> <br />Murphy Creek Tributary <br /> <br />Second Creek <br /> <br />(FPR # 49) <br />(FPR # 58) <br /> <br />First Creek from the northwestern corporate limit oflhe <br />City of Aurora upstream to Picadilly Road <br /> <br />(FPR # 73); and <br /> <br />WHEREAS, said new report for the City of Aurora dated August 16, 1995 includes the following <br />approximate floodplain information which was incorporated through electronic digitization and which <br />is consistent with approximate floodplain information previously designated and approved by Resolution <br />No. 93-334, as listed in Table 6, attached hereto and by this reference incorporated herein: <br /> <br />TABLE 6 <br /> <br />Approximate Information Which Is Consistent With Previously Prepared Aooroximate Information <br />Which Was Designated bv Resolution No. 93-334 <br /> <br />Wesl Toll Gate Creek from Alameda Avenue upstreafll to Mississippi Avenue <br /> <br />West Toll Gate Creek Tributary from Iliff Avenue upstream to Yale Avenue <br /> <br />West Toll Gate Creek Tributary from a point approximately 350 feet upstream <br />of Yale A venue upstream to Hampden Avenue <br /> <br />Wes1 Toll Gate Creek Tributary from Hampden Avenue upstream to Quincy Avenue; and <br /> <br />WHEREAS, said new report for the City of Aurora dated August 16, 1995 includes the following <br />approximate floodplain information which is inconsistent with detailed floodplain information previously <br />designated and approved by the following Resolutions listed in Table 7, attached hereto and by this <br />reference incorporated herein, which Resolutions were adopted prior to the adoption of Resolution No. <br />93-334: <br /> <br />8 <br />