My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00150
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 1:37:51 PM
Creation date
10/4/2006 9:06:49 PM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
579
County
Gunnison
Community
Marble and Vicinity
Stream Name
Crystal River
Title
Floodplain Information Report - Crystal River Technical Appendix
Date
8/1/2004
Prepared For
CWCB
Prepared By
Icon Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Manning's n values <br />su nVal SU <br />o .06754.77 <br /> <br />num_ 3 <br />nval Stll <br />.035 798.32 <br /> <br />n val <br />,06 <br /> <br />coeffContr. EX))an. <br />.1 .3 <br /> <br />I <br /> <br />Banksta: left Right lengths: Left channel Right <br />754.77 798.32 894.82849.72 700.27 <br />IneffeCtiveFlcr.e nWll- 2 <br />StaL StaR ElCv permanent <br />0583.897942.6 T <br />818.552676.647943.85 T <br /> <br />I <br /> <br />CROSS SECTION OUTPUT <br />e~r' tl~~~V (~W <br />1'1,5. Elev (ft) <br />cdt \11.5. eft) <br />E,G, Slope (ft/ft) <br />Q Total (cfs) <br />~~~ ~~~~~ H~Js) <br />Mixchlopth(ft) <br />conv.Total Ccfs) <br />Length\lltd. (ft) <br />MinChEl (ft) <br />Alpha <br />Frctnloss(ftl <br />C & E LOSS (ft <br /> <br />profilel100-year <br />7942.86 Element <br />1.15 lo/t.n-val. <br />7941.71 Reachlen. (ft) <br />7<:l4L71 F1O'HAru(sqft) <br />0.008683 Area (sq ft) <br />1691.00 Flow ~cfs) <br />1886.08 TOp Width (ft) <br />6.58 Avg. vel. (ft/s) <br />5.39 Hydr.oepth(ft) <br />18147.5 COnY. Ccfs) <br />849.75 wetted Per. (ft! <br />7938.13 shear(lb/sqft <br />1.71 5treampower(1/fts) <br />4.n Cum volume (aca-ft) <br />0.26 cum SA (acres) <br /> <br />I <br /> <br />LeftOB <br />0.060 <br />894.82 <br />7~.UI <br />86.0, <br />111.50 <br />97.98 <br />2.20 <br />0.93 <br />1840.5 <br />84.13 <br />0.50 <br />1.10 <br />1In.27 <br />48.30 <br /> <br />CrystalRiver.rep <br /> <br />Channel <br />0.035 <br />849.72 <br />155.85 <br />155.85 <br />1442.45 <br />43.55 <br />9.26 <br />3.58 <br />15480.1 <br />43.55 <br />1.94 <br />17.95 <br />96.91 <br />25.42 <br /> <br />Rig~66gB <br />700.27 <br />B.08 <br />7569.52 <br />77.05 <br />1744.55 <br />3.34 <br />1.81 <br />826.9 <br />13.26 <br />0.94 <br />3.15 <br />141.39 <br />56.84 <br /> <br />warning: The energy equation could nat be balanced within the specified number of iterations. The <br />proQram used critical depth for the water surhce and continued an with the calculations. <br />warning: Oivlded flow computed for this cross-section. <br />warning: The veloc:ity head has changed by more than 0.5 ft (0.15m). This may indicate the need for <br />additional cross sections. <br />Warning: The conveyance ratio (upstream conveyar:ce divided by dllWf1stream conveyance) is less than <br />0.7 or ~reater than 1.4. Ttris may indlCate the need far additiona) cross sectiorls. <br />warning: The energ:( lass was greater than 1.0 ft (0.3 m). between the current and previous cross section. <br />This may lndicate the need far additional croS5 sections. <br />warning: During the standard step iterations, when the assumed water surface WaS set e9ual to critical <br />depth,thecalculatedwatersurfacecamebackbelowcriticaldepth. Thisindlcates that there is <br />notavalidsubcriticalanswer. The program defaulted to critical depth. <br /> <br />CROSS SECTION OUTPUT profi1elcFloodway <br />~~~'~~:iv{~W 7942.99 Element Left 08 Channel Rig~&r.b8 <br />L28 OIt.n-val. 0.060 0.035 <br />~;~t ~~~~ ~m 794L71 Reachlen. (ft) 894.82 849.72 700.27 <br />794L71 Flow Area (sq ft) 77.77 155.68 5.62 <br />E.G. slope {ft/ft) 0.009407 Area ~s1 ft) 85.67 155.68 5.62 <br />Q Total (cfs) 1691.00 Flow c s) 177.42 1498.69 14.89 <br />~~f ~~~~~ unS) 143,04 TOP Width (ft) 97.81 43.5$ 1.68 <br />7.07 ~;a;.Vi:~;'t~f~m 2.28 9.63 2.65 <br />Max chl Opth (ft~ 3.57 0.93 3.57 3.35 <br />Cony. Total ~ds 17434.7 cony. (cfs) 1829.3 15451.9 153.5 <br />length Wtd. ft) 851.19 wetted per. (ft~ 84.02 43.55 4.86 <br />loIin ell e.l (ft) 7938.B s,ru.i1.r{lb/sqf't 0.,,4 2.10 0.68 <br />Alpha 1.65 streampower{1/fts) 1.24 20.21 1.80 <br />Frctn lOSS ~ftj 3.24 cum Volume (acre-ft) 29.76 106.97 22.46 <br />C"'Eloss ft 0.32 cum SA (acres) 11.60 25.42 8.18 <br /> <br />The energy equation could not be balanced with,n the specified number of iterations., The <br />proQram used crltical depth for the water surface and continued on with the calcuhtlons. <br />oiv1ded flow computed for this cross-section. <br />The velocity head has changed by more than 0.5 ft (O.H m). This mayindicau the rI....d for <br />additionalcrQsssectiol'ls. <br />The conveyance ratio (upstreamconveyancedividedbydllWf1streatnco nveyance) is less than <br />0.7 or greater than 1.4. This may indicate the need for additional cross sections. <br />i~1 S e~:?lrn~n~t:a~h~r~:~;r f~~a~da; ~i~~afOc~o~l' s~~~7~~~. the current and previous cross seed on. <br />During the standard step iterations, when the assumed water surface was set e~ual to critical <br />depth, the calculated water surface Came back below critical depth. Thisindlcates that there is <br />not av.lid subcritical answer. The program defaulted to critical depth. <br />CROSS SECTION OUTPUT profilelllO-year <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Warning: <br /> <br />I <br /> <br />warning: <br />warning: <br /> <br />warning: <br /> <br />warning: <br /> <br />I <br /> <br />warning: <br /> <br />I <br /> <br />~e~' H;~~v (~W <br />W.5. Elev (ft) <br />critW.S. (ft) <br />E.G. slope (ft/ft) <br />QTotal (cfs) <br />~;~.~~~~-(~~)s) <br />~~~v~h~O~~~h(~m <br />le"9thOltd. eft) <br />MinChEl(ft) <br />Alpha <br />Frctnloss(ft) <br />C,,"EloSS (ft) <br /> <br />7942.28 Element <br />0.99 wt. n-val. <br />7941.29 Reach Len. (ft) <br />7941.29 Flow Area (sq ft) <br />oi~g~~M :'i~: ~~1srt) <br />lA64....ll.'L....-To.p....Wi.dtl> (F..) <br />6.38 Avg.vel. (ft/s) <br />4.97 Hydr.Oepth(ft) <br />13998.8 conv. (cfs) <br />MII.66 wetteo l'eT. eft) <br />793t B ~~~:~ (~~~~~ m/ft s) <br />5.07 (umVolume(acre_ft) <br />0.22 cum SA (acres) <br /> <br />I <br /> <br />left 08 <br />0.060 <br />894.82 <br />45.41 <br />48.70 <br />74.37 <br />Q~.~~ <br />0.61 <br />810.8 <br />74.19 <br />0.32 <br />0.53 <br />80.54 <br />43.16 <br /> <br />CS~~~~l Rig~66g8 <br />849.72 700.27 <br />137.69 18.06 <br />137.69 6843.17 <br />1154.98 54.65 <br />'~lR&-.2~ <br />8.39 3.03 <br />3.16 1.60 <br />12592.1 595.8 <br />43.,5 n.74 <br />1.66 0.81 <br />13.93 2.44 <br />81.98 116.18 <br />25.42 50.02 <br /> <br />I <br /> <br />The energy equation could not be bahncedwithin the specified number of iterations. The <br />prOQramused critical depth for the water surhce and cOrltinued on with tile calculations. <br />oivlded flow computed for this cross-section. <br />The ...e",city r.e..d has changed by more than 0.5 ft. (0.15 m). This may indicate the need for <br />additional cross sections. <br />The energ'l' loss was greater than LOft (0.3m). betweentheCtlrrent arid previous cross sectian. <br />This maYlndicate the need for additional cross sections. <br />During the standard step iterations. when the assumed water surface was set e~ual to critical <br />depth, the calculated water surface came back below critical depth. This indlcates that there is <br />not a valid subcritical answer. The program defaulted to critical depth. <br /> <br />(ROSS SECTION O(}TPUT profileli'SO-year <br />~er' H~~:lv (~~F 7942.70 E'ement LeftOTl Channel Rig~66gTl <br />LOr. ", n-val. 0.060 0.035 <br />101.5. Elev ~ft~ 7941.64 Reach Len. (ft) 894.82 849.72 700.27 <br />CritW.S. ft 7941.64 Flow Area (sq ft) 72.27 152.79 22.19 <br />E.G. slape (ft/ft) 0.008189 Area ~s~ ft) 79.26 152.79 7446.89 <br />QTota1 (cfs) 1575.00 Flow c s) 148.72 1355.<8 71.00 <br />~~~ ~~~~ ~~nS) 1882.20 TOP width (ft) ~4.99 43,55 1743.67 <br />6.37 ~;~;. V~~;'t~fHg 2.06 8.87 3.20 <br />Max ehl opth (ft~ s.n 0.88 3.51 1.77 <br />Conv.TOtal (ds 17404.5 cony. (cfs) 164].4 14976.5 784.6 <br />lenllthwtd. eft) lI49.57 \tIettedl'er. (ft) 82.15 43.55 B.OO <br />MinChEl(ft) 7938.13 ~~~:~m (~~~~~ m/ft s) 0.45 1.79 0.87 <br />Alpha 1.69 0.93 15.91 2.79 <br />FrctnlOsS ~m 4.53 cum Volume (acre-ft) 96.49 92.91 133.80 <br />(,,"ElOSS 0.24 Cl.lmSA(acres) 47.07 25.42 55.11 <br /> <br />warning: <br />warning: <br />warning: <br /> <br />warning: <br /> <br />Warning: <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />warning: <br />warning: <br />Wa.rning: <br /> <br />The energy equation could not be balarlcedwithin the specified num bel' of iterations. The <br />program I.lsed critical depth for the water surhce and continued on with the calculations. <br />oivldedflow computed for this cross-section. <br />The velocity head has thanged by more than 0.5 ft (0.15 m). This may indicate the need for <br />page 10 <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.