Laserfiche WebLink
<br />have occurred in Rocky Ford, The PIA did perform and did not have the benefit of any detailed <br />hydrologic and hydraulic analyses for the preparation of the FIRM, Future hydraulic analyses <br />for determining IOO-year water surface elevations for approximate floodplains may be computed <br />using FEMA's Quick.Z computer program, the Corps of Engineers' HEC-Z computer program, <br />or other acceptable hydraulic methods, <br />