My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00076
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:50:34 AM
Creation date
10/4/2006 9:02:21 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Title
Floodplain Study Review and Designation program - SOQ
Date
4/1/2000
Prepared For
State of Colorado
Prepared By
Sear-Brown Group
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />U <br />D <br /> <br />u <br /> <br />o <br />~ <br />o <br />o <br /> <br />[j <br />U <br />U <br />U <br /> <br />D <br />D <br />D <br /> <br />~ <br />U <br /> <br />~ <br />~ <br /> <br />D <br /> <br />- <br /> <br /> <br />CONEJOS RIVER FLOODPLAIN DELINEATION <br />SHEEP CREEK SUBDIVISION <br /> <br />www.searbrown.com <br /> <br />The Sear-Brown Group provided hydrologic and floodplain <br />delineation services to Alamosa, Colorado based engineering firm <br />Summit Engineering in support of a proposed Sheep Creek <br />subdivision. <br /> <br />CLIENT NAME <br />Summit Engineering <br /> <br />I DO-year design discharges were determined using 44 years of local <br />USGS gage data, and statistically adjusted according to standard <br />USGS methods and the Army Corps of Engineers HEC-FFA <br />computer program. <br /> <br />Water Surface Profile Analysis was completed using HEC-RAS <br />with site topography and bridge dimensions provided by Summit <br />Engineering. <br /> <br />Sear-Brown provided Summit Engineering an exhibit showing the <br />100-year floodplain limits and an analysis summary letter detailing <br />the hydrologic and hydraulic procedures used. <br /> <br />REFERENCE <br />Scott Johnson, P.E., P.L.S. <br /> <br />PROJECT COST <br />$5,190 <br /> <br />COMPLETION DATE <br />1999 <br /> <br /> <br />:.THE SEAR-BROWN GROUP <br />
The URL can be used to link to this page
Your browser does not support the video tag.