My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD00075
CWCB
>
Floodplain Documents
>
Backfile
>
1-1000
>
FLOOD00075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 10:50:34 AM
Creation date
10/4/2006 9:02:14 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Title
Floodplain Study Review and Designation program - SOQ
Date
4/1/2000
Prepared For
State of Colorado
Prepared By
Parsons Engineering
Floodplain - Doc Type
Miscellaneous
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F:JARSONS <br /> <br />Parsons Engineering Science, Inc. . A Unit of Parsons I'lfril<:t "\JC:lIIe 8.: r'::chnoloq;' Group Inc. <br />"" (:1," 8 '--,c) <br /> <br />April 7, 2000 <br /> <br />Mr. Tom Browning <br />Colorado Water Conservation Board <br />1313 Sherman Street, #721 <br />Denver, CO 80203 <br /> <br />Subject: Statement of Qualifications, Floodplain Study Review and Designation Program <br /> <br />Dear Mr. Browning, <br /> <br />Parsons Engineering Science, Inc. (Parsons ES) is pleased to submit this statement of <br />qualifications (SOQ) to the Colorado Water Conservation Board (CWCB) for the Floodplain <br />Study Review and Designation Program, We are proposing to provide you our best hydraulic <br />engineers, all of whom are experienced in the development and technical review of floodplains, <br />hydrology, and hydraulics, This team has performed floodplain studies and reviewed others' <br />studies in Colorado and throughout the Western United States, We have all of the in-house <br />engineering and scientific disciplines that are necessary to perform this project. <br /> <br />Parsons ES is able and eager to perform this work for the cweB, We understand the project <br />requirements and are committed to working closely with the CWCB, Pleast~ contact our <br />designated project manager, Dr. Gary Lewis at (303) 831-8100, or me if you have any <br />questions, We look forward to the opportunity to discuss our capabilities and technical <br />expertise with your selection committee. <br /> <br />Sincerely, <br /> <br />PARSONS ENGINEERING SCIENCE, INC. <br /> <br />jJ J:.~ J? ~-d, <br /> <br />Peter R, Guest, P,E. <br />Office Manager <br /> <br />cc: Enclosure <br /> <br />022^\DENFSO I \PRJDAT A$\ES\SHARED\L01I1SA\LOTCWCB.DOC <br /> <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.