Laserfiche WebLink
<br />intake pipe to a culvert located under the detention pond and <br />Hampden Avenue (State Highway 30). <br /> <br />Peak discharges for Sanderson Gulch and Weir Gulch were determined <br />as part of the 1972 UDFCD Major Drainageway Planning report <br />(Reference 41). The 10-, 50-, and 100-year discharges were <br />calculated using the Colorado Urban Hydrograph Procedure <br />(Reference 40) for fully developed basin conditions. The SOO-year <br />discharge was extrapolated from the data. Peak discharges on Weir <br />Gulch downstream of Barnum Lake were revised to reflect channel <br />improvements at Barnum Lake and increased culvert capacity at West <br />6th Avenue (U.S. Highway 6). <br /> <br />Peak discharges for First Avenue Tributary and Dakota Avenue <br />Tributary were determined as part of the 1977 UDFCD Flood Hazard <br />Area Delineation report (Reference 20). Those discharges were <br />calculated in accordance with the Colorado Urban Hydrograph <br />Procedure (Reference 40) assuming fully developed basin conditions. <br />The subbasin hydrographs were routed downstream. The Puls Method <br />was used to calculate discharges at locations where storage had a <br />significant effect. <br /> <br />Peak discharges for Sand Creek were determined as part of the 1977 <br />UDFCD Flood Hazard Area Delineation report (Reference 42). The <br />hydrologic analysis was based on the development of a surface- <br />runoff model of the Sand Creek basin using the runoff block of the <br />EPA Storm Water Management Model (Reference 37). Discharge <br />hydrographs developed from the model were then routed along the <br />main stem of Sand Creek by use of an unsteady flow-routing <br />procedure developed by James A~ Harder and modified by the Missouri <br />River Division of the COE. 'Discharge probability relationships <br />were developed by inserting precipitation-frequency val~es <br />(Reference 43). The discharges were calculated for fully developed <br />basin conditions. <br /> <br />Peak discharges for the South Platte River were determined as part <br />of the September 1985 UDFCD Flood Hazard Area Delineation report <br />(Reference 44). Peak-frequency values for the South Platte River <br />were taken from the May 1983 Hydrologic Study report prepared by <br />Merrick and Company under contract to the UDFCD (Reference 45). <br /> <br />Peak discharge-drainage area relationships for all streams studied <br />by detailed methods are shown in Table 2. <br /> <br />3.2 Hydraulic Analyses <br /> <br />Analyses of the hydraulic characteristics of flooding from the <br />sources studied were carried out to provide estimates of the eleva- <br />tions of floods of the selected recurrence intervals. <br /> <br />Locations of selected cross sections used in the hydraulic analyses <br />are shown on the Flood Profiles (Exhibit 1). For stream segments <br />where a floodway was computed (Section 4.2), selected cross section <br />locations are also shown on the Flood Insurance Rate ~ap. <br /> <br />18 <br />