My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02653
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:46 PM
Creation date
10/4/2006 7:18:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2005
Description
ISF Section - Injury with Mitigation Proposal - Case Nos. 7-83CW45 and 4-83CW14, US Bureau of Reclamation Paradox Salinity Control Unit
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-4- <br /> <br />. <br /> <br />1 <br />. <br /> <br />. sets forth the obligations of Reclamation to: <br />~ work with the District to ensure that the 700 acre-feet of augmentation water is <br />available for release eve!)' year <br />~ operate the Unit in a manner that will maximize environmental benefits to the <br />Dolores River <br />~ notify the CWCB of any plans to modify the Unit that may result in a change in <br />the amount of out-of-priority depletions at the Unit <br />. provides that the CWCB will not place a call against the Unit for the Dolores River ISF <br />while the agreement is in effect, except under certain conditions after consultation with <br />Reclamation, or if Reclamation has augmentation water available for release but does not <br />release it when requested to do so by the Division Engineer. <br />. provides that the parties will reevaluate and amend the agreement if necessary in the <br />event Reclamation develops plans to modify the Paradox Unit in a manner that may <br />change the amount of out-of-priority depletions at the Unit. <br /> <br />This proposal would allow some inju!)' to the Dolores River instream flow water right, but the <br />mitigation offered by the Applicant may enable the Board to accept that inju!)' while continuing <br />to preserve the natural environment of the Dolores River to a reasonable degree. Further, this <br />proposal will allow both preservation of the natural environment of the Dolores River by the <br />CWCB and maintenance of the significant environmental benefits realized by the continued <br />operation of the Paradox Salinity Control Unit. <br /> <br />The Division Engineers for Water Divisions 7 and 4 have reviewed this proposal and find it . <br />acceptable and administrable. One question that has arisen is whether the Division Engineer can <br />administer the agreement without Reclamation amending its augmentation plan decree. The <br />parties believe that amending the decree will not be necessa!)', but Staff has requested the <br />Attorney General's Office to research this issue. The Colorado Division of Wildlife currently is <br />reviewing this proposal and will provide its input to staff prior to the second meeting of this <br />process. <br /> <br />Staff Recommendation <br />Staff is asking the Board to consider entering into the proposed agreement under lSF Rule 8i. (3) <br />(Inju!)' Accepted with Mitigation). As stated above, inju!)' with mitigation is a two-meeting <br />process. At the first meeting, the Board may conduct a preliminary review of the inju!)' with <br />mitigation proposal to determine whether the natural environment could be preserved to a <br />reasonable degree with the proposed injury or interference if applicant provided mitigation. At a <br />subsequent meeting, the Board may take final action to ratifY, refuse to ratify or ratify with <br />additional conditions. <br /> <br />Staff recommends that the Board: <br /> <br />I) Make the prelimina!)' determination that the natural environment of the Dolores River could <br />be preserved to a reasonable degree with the proposed inju!)' or interference if applicant <br />provided the proposed mitigation. <br />2) Provide comments to Staff on the proposed Memorandum of Agreement. <br /> <br />e <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.