Laserfiche WebLink
<br />) <br />.. <br /> <br />Water Proiect Construction P;:ol!ram - Proiect Data <br />Non-Reimbursable Investment <br /> <br />Applicant: Colorado Water Conservation Board <br /> <br />Project Name: Integrated Water Information Center <br /> <br />Project Type: Digital and hardcopy information access <br /> <br />County: Statewide Drainage Basin: Statewide <br /> <br />Water Source: N/A <br /> <br />Total Study Cost: $275,000 <br /> <br />Funding Sources: CWCB <br /> <br />Type of Applicant: State Agency <br /> <br />Median Household Income: N/A <br /> <br />CWCB Investment: $275,000 <br /> <br />The Integrated Water Information Center (IWIC), a combination of the Water Resource Information Center, the <br />CWCB Imaging System and the Colorado Decision Support System (CDSS), will provide public and agency <br />access to the myriad ofCWCB's water-related records. <br /> <br />ontinuation of Document Pre aration Indexin and Scannin <br />By the end of FY04, the imaging of the existing documents (backfile) for the CWCB, with the exception of the <br />Compact Section, will be completed. The Compact Section is estimated to have approximately 500,000 document <br />pages remaining to be imaged. The Imaging Committee estimates that those document pages can be imaged in FY <br />2005-06, at a cost estimated at $100,000. <br /> <br />Operations and Maintenance of DNR Imal!inl! System <br />As a part of the CWCB's participation in DNR's Electronic Document Imaging System, the agency is required <br />to annually contribute funds towards the operations and maintenance of the System. The CWCB's share is <br />$25,000 per year for each of the next three fiscal years. <br /> <br />Upl!rade, Operations and Maintenance of Traininl! Space <br /> <br />In order to provide an accessible, up-to-date training center, as well as access to bound and imaged documents; <br />the CWCB will need to provide adequate space and equipment for these needs. The CWCB Space committee <br />estimates the costs oflease space and equipment to be $100,000 over the next 4 years. <br /> <br />. <br /> <br />Flood Protection. Water Project Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />