My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02639
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:43 PM
Creation date
10/4/2006 7:18:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FL Gin H20 LLC Agenda Item 25d <br />Marct\ 16-17, 2004 (Updated March 18, 2004) <br /> <br />. Water Project Construction Loan Program-Project Data <br />, <br /> <br />Borrower: FL Gill H20 LLC <br /> <br />County: Washington <br /> <br />Project Name: Recharge and Augmentation Project <br /> <br />Project Type: Well Augmentation <br /> <br />Drainage Basin: South Platte River <br /> <br />Water Source: South Platte River <br /> <br />Total Project Cost: $127,500 <br /> <br />Funding Sources: CWCB and Company <br /> <br />Type of Borrower: Agricultural <br /> <br />Median Household Income: N/A <br /> <br />CWCB Loan: $114,750 <br /> <br />Interest Rate: 2.25% Term: 20 years <br /> <br />CWCB Grant: $300 <br /> <br />Average annual well diversions: 1,072 acre-feet <br /> <br />The FL Gill H20 LLC, located in Washington County, consists of the ov.mers or 3 contiguous <br />faons under the Johnson and Edwards Ditch, with a combined irrigated acreage of 91 0 acres. The <br />project involves construction of 4 recharge ponds, drilling one recharge well, constructing a <br />pipeline between the well and a private lateral, and purdlasing a share of reservoir water. The <br />project INIlJ generate augmentation credits to cover depletions for 4 Irrigation \Neils used by the <br />members of the Company. The project will be completed by spring 2005. Brent Nation. P.E.. of <br />.ation Engineering Services has completed the feasIbility study. Proposed funding for the project <br />'.! consists of a $114.750 Small Project Loan and a $300 Feasibility Study Grant from the CWCB, <br />and the remainder from the Company. <br /> <br />, <br />~ <br />. <br />. <br /> <br /> <br />~ <br /> <br />'. <br /> <br />Location Map <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.