My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02639
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:43 PM
Creation date
10/4/2006 7:18:09 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />East Fort MutlJal DIIdl COmpany <br />January 27. 2004 <br /> <br />Agenda 118m 14b. <br /> <br />. <br /> <br />Water Project Construction Loan Program-Project Data <br /> <br />Borrower: East Fori< Mutual Irrigation Company County: Grand <br /> <br />Project Name: Pipe and Slope Stabilization Project Type: System Rehabilitation <br />Drainage Basin: Colorado Water Source: E. Fork Troublesome Cri<. <br />Total Project Cost: $343,049 Funding Sources: Company and CWCS <br /> <br />Type of Borrower: Agricultural Interest Rate: 2.5% <br /> <br />CWCS Loan: $259,860 (Includes Org. Fee) Term: 30 years <br /> <br />CWCB Grant: $5,000 <br /> <br />Average Annual Volume of Water diverted: 8,000 AF <br /> <br /> <br />The EFMIC, located In Grand County, owns and operates the East Fori< Ditch to deliver direct flow <br />Irrigation water for the benefrt of the 7 shareholders. Water Is diverted from the East Fori< of <br />Troublesome Creek, located about 10 miles northeast from the Town of Kremmllng, through a 13- <br />mile ditch system to the 4,OOO-acre servlce area. The East Fork Mutual Irrigation Company <br />(EFMIC) is applying for a loan in the amount of $257.287 to make repairs to their existing dftch <br />system. The esllmated total cost of the proJect Is $343,049, which includes pipe Installation. pipe <br />oint rehabilitation, slope stabilization. and concrete headwalls. <br /> <br /> <br />~"2:~l c' pro;ect Loca~on" <br />, '." '" <br /> <br />.y'); '-: <br /> <br />Location Map <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.