My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD02631
CWCB
>
Board Meetings
>
Backfile
>
2001-3000
>
BOARD02631
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:17:39 PM
Creation date
10/4/2006 7:18:07 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/29/1999
Description
WSP Section - Colorado River Basin Issues - Ruedi Reservoir - Proposed Contract for the Release of 21,650 AF to Endangered Fish in the 15-Mile Reach
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />, . <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />c. All water releases will be measured at the outlet works by the Contracting Officer with <br /> <br />equipment furnished, operated, and maintained by Reclamation. The Service through the <br /> <br />Recovery Program shall install, operate, maintain, and replace any waterflow measuring and <br /> <br />recording devices necessary to accept delivery and protect the water in the IS-mile reach. <br /> <br />d. The amount, timing, and rate of the releases from Ruedi Reservoir shall be determined by the <br /> <br />Contracting Officer in consultation with the Service. Reclamation will provide advance <br /> <br />notification to the Board and the Division Engineer for Water Division 5 of the date, time, and <br /> <br />amount of the water released. The Service and Reclamation shall consult with the Board during <br /> <br />the release period to achieve the objectives of Reclamation, the Service, and the Board. <br /> <br />e. The Board is responsible for calling upon the State Engineer for the carriage, use, handling, or <br /> <br />distribution of the water beyond the outlet works of Ruedi Reservoir or of an alternate reservoir <br /> <br />pursuant to Article 7.a. hereof to the terminus of the IS-mile reach. The water shall be subject to <br /> <br />such transit losses as may be imposed by the State Engineer or the Division Engineer for Water <br /> <br />Division 5. <br /> <br />f. The Service or the Board will not be responsible for the storage of water in, or the operation <br /> <br />and maintenance of, Ruedi Reservoir. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.